Question 1

Which of the following statements about the latency of a storage and forwarding device is false?

Options:

A.

The last bit of the data frame enters the device and starts timing.

B.

The first bit of the data frame enters the device and starts timing.

C.

Reflects the performance of network devices. Generally, it is not compared with the bit forwarding device.

D.

The first bit of the data frame appears at the output port of the device and stops timing.

Question 2

MPLS APS is a network protection mechanism. It implements service switching by using the MPLS OAM detection function.

Options:

A.

True

B.

False

Question 3

Dispersion compensation is not required for 40 Gbit/s and 100 Gbit/s coherent systems because the dispersion tolerance of coherent boards is large. NG WDM products do not support hybrid transmission of non-coherent and coherent networks.

Options:

A.

True

B.

False

Question 4

Which of the following statements about the modulation technologies of the 40Gbit/s and 100Gbit/s coherent systems are correct?

Options:

A.

The modulation technology used in a 100G coherent system is ePDM-QPSK.

B.

The modulation technology used in a 40G coherent system is ePDM-BPSK.

C.

The modulation technology used in a 40G coherent system is ePDM-QPSK.

D.

The modulation technology used in a 100G coherent system is ePDM-BPSK.

Question 5

Which of the following is not a PW APS switching condition?

Options:

A.

A warm reset is performed on the board.

B.

The board software is faulty.

C.

MPLS_PW_SF

D.

A cold reset is performed on the board.

Question 6

Loopback is a common operation for routine maintenance and troubleshooting. Which of the following statements about loopback operations are incorrect?

Options:

A.

The hardware loopback is performed by using the fiber jumper or self-loop cable to perform the loopback on the optical port or electrical port.

B.

When performing a hardware loopback on an optical port, you need to add an optical attenuator.

C.

After the outloop is performed, the signals are transmitted to the internal.

D.

After the inloop is performed, the signals are transmitted to the external.

Question 7

In the scenario where the non-convergence OTU processes OTN standard signals, both A and B are WDM sites. After receiving the OTUk_TIM alarm on the client side, the OTU board at station A sends the OTUk_BDI alarm to the upstream. When the TIM follow-up action is disabled, the alarm is no longer transmitted to the downstream. When the TIM follow-up action is enabled, an SF event is generated. The WDM side of the OTU board at station B reports the ODUk_PM_AIS alarm, and the ODUk_PM_AIS alarm is transmitted downstream. The client equipment reports this alarm. After the WDM side of the OTU board at station B receives the OTUk_TIM alarm and the TIM follow-up action is disabled, the alarm is no longer transmitted to the downstream. When the TIM follow-up action is enabled, an SF event is generated. After the client side of station B processes the SF event, the client equipment reports the ODUk_PM_AIS alarm.

Options:

A.

True

B.

False

Question 8

If tunnel APS is configured for the tunnel to which the PW belongs, PW APS cannot be configured for the PW.

Options:

A.

True

B.

False

Question 9

Which of the following methods can be used to analyze faults in the NG WDM system?

Options:

A.

Loopback

B.

Service Signal Flow Analysis

C.

RMON

D.

Replacement