Question 1

Which of the following functions is not achieved by formulating a project delivery process?

Options:

A.

Improve customer satisfaction.

B.

Determine the division of responsibilities.

C.

Improve work efficiency.

D.

Reduce project risks.

Question 2

During the migration test, which of the following indicates that the test is completed?

Options:

A.

The network is running properly.

B.

Tested network services are running properly.

C.

Tested upper-layer application services are running properly on the network.

D.

Command outputs are correct.

Question 3

Which of the following operations may be needed for checking the service traffic path? (Multiple Choice)

Options:

A.

Check the service traffic path at the data link layer.

B.

Check the service traffic path at the network layer.

C.

Survey the service traffic path planning in the network design phase.

D.

Check the fault frequency.

Question 4

Which of the following contents is not negotiated on a project kick-off meeting?

Options:

A.

Determine customer's requirements.

B.

Verify implementation costs.

C.

Confirm owners of party A and party B.

D.

Determine the project management regulations.

Question 5

Enterprise networks usually use DHCP to assign IP addresses to users. Unlike static IP address assignment, DHCP address assignment greatly reduces the workload for managing network addresses.

Options:

A.

TRUE

B.

FALSE

Question 6

Which of the following operations should be performed preferentially for Telnet login failure troubleshooting?

Options:

A.

Check whether the client can ping the server.

B.

Check whether the number of login users reaches the upper limit.

C.

Check whether an ACL is configured in the VTY user interface view.

D.

Check whether the access protocol is correctly configured in the VTY user interface view.

Question 7

In most cases, a risky operation solution can be reviewed and finalized one day before implementation.

Options:

A.

TRUE

B.

FALSE

Question 8

A network project is often used with the corresponding supporting systems. Which of the following supporting systems are usually included? (Multiple Choice)

Options:

A.

Power supply system

B.

Air conditioning system

C.

Transportation

D.

Office equipment

E.

Extra-low voltage cabling

Question 9

Which of the following causes may result in an IS-IS neighbor relationship fault? (Multiple Choice)

Options:

A.

The devices on two ends of a link have the same system ID.

B.

The devices on two ends of a link have inconsistent IS-IS levels.

C.

When an IS-IS Level-1 neighbor relationship is established, the devices on two ends of a link have inconsistent area addresses.

D.

The IP addresses of interfaces on two ends of a link are on different network segments.

Question 10

Which of the following items are used to remind customers of information security? (Multiple Choice)

Options:

A.

Account sort-out reminder

B.

Password update reminder

C.

Log protection reminder

D.

Data backup reminder

Question 11

Assume that you received a phone call at your office seat. An employee said he/she could not access the Internet on the PC and needed your technical support. Then you ran the ping command on his/her PC and ran the tracert command to check where packet loss occurred. Which of the following troubleshooting methods is used in this process?

Options:

A.

Configuration comparison

B.

Bottom-up

C.

Service traffic path check

D.

Top-down

Question 12

Which of the following operations is not used to verify a migration solution?

Options:

A.

Build an FOA site for tests.

B.

Perform technical review by each involved party.

C.

Review the solution by original vendor experts.

D.

Assess risks.

Question 13

Which of the following protocols can be deployed to quickly detect network link faults?

Options:

A.

BFD

B.

RSTP

C.

iSPF

D.

Smart-Link

Question 14

Which of the following causes for VRRP group flapping is the most impossible?

Options:

A.

The link where VRRP Advertisement packets are transmitted changes from Up to Down frequently.

B.

The interval for sending VRRP Advertisement packets is small.

C.

Association between VRRP and BFD is configured to implement a rapid master/backup switchover.

D.

VRRP packets are discarded randomly because congestion occurs.

Question 15

Which of the following statements is not included in network security optimization?

Options:

A.

Management security

B.

Border security

C.

Access control

D.

Log management

Question 16

During troubleshooting, you analyze and check the fault cause at the access layer, aggregation layer, and core layer in sequence. Which of the following troubleshooting methods is used in this process?

Options:

A.

Chunking

B.

Configuration comparison

C.

Segmentation

D.

Bottom-up

Question 17

Which of the following contents are included in a project implementation solution? (Multiple Choice)

Options:

A.

Time plan

B.

Personnel arrangement

C.

Migration process

D.

Risk control measures

Question 18

Which of the following architecture is used by mainstream switches?

Options:

A.

Bus

B.

Shared memory

C.

Switching matrix

D.

Distributed

E.

Clos architecture

Question 19

In the process of daily troubleshooting, engineers may need to check some reported information of the equipment.

By executing the terminal______ command, turn on the terminal to display the debugging/logging information function sent by the information center. (Please use English lowercase letters to complete the command, and the command cannot be abbreviated)

Options:

Question 20

To rectify a VRRP group two-master fault, run the display this command on VLANIF interfaces on both ends of the VRRP group. Which of the following operations is not performed?

Options:

A.

Check whether the interface IP addresses are on the same network segment.

B.

Check whether the VLANIF interfaces have the same VRRP group ID.

C.

Check whether the virtual IP address is the same on the VLANIF interfaces in the VRRP group.

D.

You do not need to check whether the interval for sending VRRP Advertisement packets is the same on the VLANIF interfaces.

Question 21

After the connection is completed, what items are generally required to be checked?

Options:

A.

Data flow

B.

Indoor topology

C.

Software version

D.

Control plane entries

Question 22

After the project delivery, the O&M expenses are continuously generated. Which of the following items are the expenses generated during the O&M? (Multiple Choice)

Options:

A.

Energy expenses

B.

Line construction expenses

C.

Line lease expenses

D.

Equipment depreciation expenses

E.

Staff expenses

Question 23

Which of the following networks are involved during construction of a large enterprise network? (Multiple Choice)

Options:

A.

Backbone network

B.

Transport network

C.

Data center network

D.

Wireless network

E.

Storage network

Question 24

The migration rollback time can be determined based on the actual migration situation without the need to plan in advance.

Options:

A.

TRUE

B.

FALSE

Page: 1 / 6