Question 1

A customer wants to centrally manage their multipath software installation using Hitachi Global Link Manager (HGLM). What are two server requirements before proceeding with the HGLM installation? (Choose two.)

Options:

A.

Stop security-monitoring programs or virus detection programs.

B.

Install the Hitachi Command Suite on the server.

C.

Ensure port number 162 is not being used by another product.

D.

Ensure port number 182 is not being used by another product.

Question 2

Which three documents must be verified when planning a microcode exchange? (Choose three.)

Options:

A.

ECNs

B.

FCO Bulletins

C.

Product Alerts

D.

Maintenance Manual

E.

Microcode Exchange Reference Guide

Question 3

What is the maximum number of 3.5" HDDs per B4 unit in a VSP?

Options:

A.

32

B.

40

C.

60

D.

64

Question 4

A customer has created User Accounts within Storage Navigator on a VSP. How can you create a backup of this information?

Options:

A.

Create a ghost image of the SVP.

B.

Use HiSat to keep track of the information in a CSV format.

C.

Copy the source files from the SVP.

D.

Use the download configuration function of the Storage Navigator control panel.

Question 5

What would you use to determine the recommended amount of cache for a specific VSP configuration?

Options:

A.

HiFire

B.

SearchLight

C.

VSP Maintenance Manual

D.

HiConfig

Question 6

A customer has virtualized a USP behind a VSP. Which two actions can be performed by Universal Volume Manager? (Choose two.)

Options:

A.

format external volumes

B.

disconnect external volumes

C.

assign internal LDEV addresses to external volumes

D.

migrate VSP volumes to the USP

Question 7

A customer is using an AMS 2300 system as external storage behind a VSP. They are reworking the power distribution and need to power down both storage systems. What is the correct sequence of actions?

Options:

A.

Stop the host I/O > power off the VSP > power off the AMS 2300.

B.

Stop the host I/O > power off the AMS 2300 > power off the VSP.

C.

Perform a path disconnect to the AMS 2300 > stop the host I/O > power off the AMS 2300 > power off the VSP.

D.

Stop the host I/O > perform a path disconnect to the AMS 2300 > allow the storage systems to go to battery backup mode when the power is

disconnected.

Question 8

What are two requirements for connecting a USP VM as external storage to a VSP? (Choose two.)

Options:

A.

an External port on the VSP

B.

a Target port on the USP VM

C.

an Initiator port on the USP VM

D.

an RCU Target port on the VSP

Question 9

A customer has removed the Data Retention license key from a VSP. What must be done so the customer can make use of the Data Retention functionality again?

Options:

A.

Re-install the same license key again.

B.

Order a new license key and install it.

C.

Re-enable the license key.

D.

Enter the Available Mode and re-activate the license key.

Question 10

After opening a case with the Hitachi Data Systems technical support center, you have been asked to collect error information. How do you send the collected data to the technical support center?

Options:

A.

Upload to ftp://ftp.hds.com.

B.

Upload to https://tuf.hds.com.

C.

Upload to http://www.hds.com.

D.

Send an email to techsup@hds.com.

Question 11

When is a microcode exchange process complete on a VSP?

Options:

A.

After the SVP has rebooted.

B.

When all I/Os resume across all the mapped storage paths.

C.

When the 'Ready' LED turns green.

D.

When the message ormal End?is displayed.When the message ?ormal End?is displayed.

Question 12

Hitachi Dynamic Link Manager (HDLM) has been configured on a Solaris 10 server with 10 LUNs across two paths. You want to verify the number of LUNs and the path assignments. Which command would you use?

Options:

A.

dlnkmgr check -path

B.

dlnkmgr view -path -c

C.

dlnkmgr disp -lun -path

D.

dlnkmgr show -stinfo -t

Question 13

What are two prerequisites for virtualizing volumes on a VSP? (Choose two.)

Options:

A.

Shared memory must be reserved for external storage operations.

B.

The external storage system must be connected to one or more external ports of the VSP.

C.

A CLPR must be created for the external storage.

D.

The Universal Volume Manager license must be installed in the VSP.

Question 14

What are two ways to ensure secure access to storage through a fabric? (Choose two.)

Options:

A.

Use SNMP.

B.

Use zoning.

C.

Use Host Group security.

D.

Use port security on the switch(es).

Question 15

A customer is using a Hitachi Enterprise storage system with clustered servers in an active/passive relationship. What must be done in Hitachi Dynamic Link Manager (HDLM) to ensure that the status of inactive paths on both passive and active nodes is monitored regularly?

Options:

A.

Switch on Auto Failback.

B.

Switch on Path Health Check.

C.

Set the reservation level to 2.

D.

Set up Intermittent Error Monitoring.

Question 16

A customer wants to install an Emulex HBA in a server accessing storage in a Hitachi VSP system. Where can you verify that the given configuration is supported?

Options:

A.

VSP maintenance manual

B.

HDS HBA implementation guide

C.

Storage Navigator User's Guide

D.

HiFire on HDS intranet/extranet

Question 17

A customer is using the Hitachi Command Suite for their VSP environment. Which tab in the GUI provides the Hitachi Tiered Storage Manager volume migration functionality?

Options:

A.

the Analytics tab

B.

the Mobility tab

C.

the Migrator tab

D.

the Tiering tab

Question 18

In which two situations would you use the VSP New Installation procedure at a customer site? (Choose two.)

Options:

A.

when adding another set of CHAs

B.

when adding a second DKC to an existing system

C.

when performing major changes in RAID structures, emulation and/or LDEV configuration

D.

if instructed to do so by the Hitachi Global Support