Weekend Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Pass Using CTFL-AT Exam Dumps

Page: 5 / 6
Total 80 questions

Certified Tester Foundation Level Agile Tester Questions and Answers

Question 17

Which of the following is a risk that continuous integration introduces?

Options:

A.

Teams sometimes over-rely on unit tests and exclude some important system and acceptance tests.

B.

Testers sometimes have too many builds to test, which reduces the quality of testing.

C.

Teams no longer have the ability to run manual tests, as all tests must be automated.

D.

Developer's workload is increased, which can result in a reduction of output.

Question 18

Which of the following sentences related to Risk-based testing is CORRECT?

Options:

A.

Risk-based testing fits well in Agile development processes, as risks are analyzed twice - during release and iteration planning.

B.

Risk-based testing does not fit well in Agile development processes, as short iterations mandate short test times.

C.

Risk-based testing does not fit in Agile development processes, as each iteration focuses on limited parts of the product.

D.

Risk-based testing fits well in Agile development processes, as risks are easy to identify when the work is divided into user stories.

Question 19

Which of the following statements about Agile retrospectives is true?

Options:

A.

Agile retrospectives should be focused mainly on obstructions and hindrances that are outside the control of the team because these issues are more challenging

B.

Traditional projects require feedback from retrospectives; however, Agile retrospectives do not require follow-up activities

C.

Agile retrospectives should be focused on the team members and business representatives, and other participants should not attend or contribute

D.

Agile retrospectives should also provide feedback to the current iteration planning regarding planning accuracy, contents, and the efficiency of the work in the team

Question 20

During a retrospective, which of the following items would be the LEAST effective to generate discussions on process improvement?

Options:

A.

The build process was slow and this often caused delays waiting for the build to complete.

B.

For the last sprint the estimated and actual effort were much higher than the team capacity.

C.

The automation tests failed frequently without any logs to help in debugging the failure reason.

D.

One of the testers was regarded as being both disruptive and lazy and did not contribute to team success.

Page: 5 / 6
Total 80 questions