Question 17

You are about to release a test progress report to a senior manager, who is not a test specialist. Which of the following topics should NOT be included in the test progress report? 1 credit

Options:

A.

Product risks which have been mitigated and those which are outstanding.

B.

Recommendations for taking controlling actions

C.

Status compared against the started exit criteria

D.

Detailed overview of the risk-based test approach being used to ensure the exit criteria to be achieved

Question 18

Since the system is in the medical domain and therefore in the safety critical area, testing needs to be rigorous and evidence is required that the system has been adequately tested. Identify THREE measures that would typically be part of the test approach in this domain and which are not always applicable in other domains! 1 credit

Options:

A.

High level of documentation

B.

Failure Mode and Effect Analysis (FMEA) sessions

C.

Traceability to requirements

D.

Non-functional testing

E.

Master test planning

F.

Test design techniques

G.

Reviews

Question 19

Which of the following is a characteristic of good testing in any life cycle model? 1 credit

Options:

A.

Analysis and design of tests begins as soon as development is completed.

B.

Some, but not all, development activities have corresponding test activities.

C.

Each test level has test objectives specific to that level.

D.

All document reviews involve the development team.

Question 20

Which of the following would you expect to see in the master test plan? 1 credit

Options:

A.

A description of how the test cases are cross-referenced to requirements in the test management tool.

B.

A detailed identification of the resources that will carry out structural testing in the first iteration.

C.

The test approach that will be applied at system integration testing.

D.

A list of the names of the testers who will carry out the performance testing for the final iteration.