Big 11.11 Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Note: This exam is available on Demand only. You can Pre-Order this Exam and we will arrange this for you.

Pre-Order Your ISTQB Certified Tester Advanced Level - Test Automation Engineer TAE

You can pre-order your ISTQB Certified Tester Advanced Level - Test Automation Engineer exam to us and we will make it available in 2 Weeks to 3 Weeks maximum. CertsTopics.com Team will Arrange All Real Exam Questions only from Real Exam within next 2 Weeks to 3 Weeks Time only and make them available for you.

How to Place Pre-Order You Exams:

  1. Click to "Add to Cart"
  2. Our Expert will arrange real Exam Questions within 2 Weeks to 3 Weeks especially for you.
  3. You will be notified within (2 Weeks to 3 Weeks time) once your Exam is ready with all Real Questions with PDF + Testing Engine format.

Why to Choose CertsTopics?

  • Only we can provide you this Pre-Order Exam service. If your required exam is not available on our website, Our Team will get it ready for you on the cost price!
  • Over 5000+ our customers worldwide are using this pre-ordering service.
  • Approx 99.8% pass rate among our customers - at their first attempt!
  • 90 days of free updates included!

In the unlikely event if we can't make this exam available to you then you will issue a full refund! So there is no risk involve at all.

READY TO MAKE YOUR "TAE" PRE-ORDER?

Yes, I agree

$850  $425

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

ISTQB Certified Tester Advanced Level - Test Automation Engineer Questions and Answers

Question 1

Consider a TAS deployed into production. The SUT is a web application and the test suite consists of a set of automated regression tests developed via GUI. A keyword-driven framework has been adopted for automating the regression tests. The tests are based on identification at low-levels of the web page components (e.g class indexes, tab sequence indexes and coordinates) in the next planned release the SUT will be subject to significant corrective maintenance (bug-fixes) and evolution (new features) Maintenance costs to update the test scripts should be as low as possibleand the scripts must be highly reusable.

Which of the following statements is most likely to be TRUE?

Options:

A.

The keyword-driven framework is not suitable, it would be better to adopt a structured-scripting approach

B.

False positive errors are likely to occurwhen running the automated tests on the new releases without modifying the test

C.

The total execution time of the automated regression test suite will decrease for each planned release.

D.

The keyword-driven framework introduces a level abstraction that is too high and makes it difficult what really happens

Buy Now
Question 2

Which of the following success factors for a test automation project is TRUE?

Options:

A.

Automated tests must be designed to capture only the datathat is strictly needed for comparing expected and actual results

B.

The test cases to be automated first must always be selected based on the number of times a test will need to be run

C.

The test cases to be automated must have a high dependency on particular data values

D.

Automated tests that fail due to changes in the requirements of the SUT should be promptly fixed rather than disabled from the test suite

Question 3

You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the 11thtest. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.

What is the MOST important FIRST step to be taken immediately afterthe abnormal occurred when executing the 11thtest?

Options:

A.

Re-run the test automation suite starting from the 12thtest

B.

Return the database to a consistent state that allows subsequent test to run

C.

Take a backup of the database in its current state. So It can be analyzed later

D.

Re-run the test automation suite starting from the 1sttest.