Black Friday Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

TAE Exam Dumps : ISTQB Certified Tester Advanced Level-Test Automation Engineering

PDF
TAE pdf
 Real Exam Questions and Answer
 Last Update: Dec 1, 2024
 Question and Answers: 40
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
TAE exam
PDF + Testing Engine
TAE PDF + engine
 Both PDF & Practice Software
 Last Update: Dec 1, 2024
 Question and Answers: 40
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
TAE Engine
 Desktop Based Application
 Last Update: Dec 1, 2024
 Question and Answers: 40
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

ISTQB Certified Tester Advanced Level-Test Automation Engineering Questions and Answers

Question 1

You are reviewing the testability of your SUT.

Which of the following BEST refers to the characteristic of OBSERVABILITY?

Options:

A.

The ability of the SUTto perform its intended function for a specified period of time

B.

The ability to exercise the SUT by entering inputs, triggering events and invoking methods

C.

The ability of the SUT to prevent unauthorized access to its components or data.

D.

The abilityto identify states, outputs, intermediate result and error messages in the SUT

Buy Now
Question 2

You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the 11thtest. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.

What is the MOST important FIRST step to be taken immediately afterthe abnormal occurred when executing the 11thtest?

Options:

A.

Re-run the test automation suite starting from the 12thtest

B.

Return the database to a consistent state that allows subsequent test to run

C.

Take a backup of the database in its current state. So It can be analyzed later

D.

Re-run the test automation suite starting from the 1sttest.

Question 3

A SUT has an existing automated test suite.

Which of the following statements relating to the introduction of new features in the SUT is TRUE?

Options:

A.

Automated tests are not affected by the introduction of a new feature and running them against the new SUT is a waste of effort

B.

The introduction of a new feature could require updates or additions to the testware components

C.

The test automation engineer should work with the business analysts to ensure the new feature is testable

D.

It is generally more difficult to automate test cases for a new feature as the developmenthas not yet started