Month End Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

BCS TAE Exam With Confidence Using Practice Dumps

Exam Code:
TAE
Exam Name:
ISTQB Certified Tester Advanced Level-Test Automation Engineering
Vendor:
Questions:
40
Last Updated:
Apr 30, 2025
Exam Status:
Stable
BCS TAE

TAE: Test Automation Engineering Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the BCS TAE (ISTQB Certified Tester Advanced Level-Test Automation Engineering) exam? Download the most recent BCS TAE braindumps with answers that are 100% real. After downloading the BCS TAE exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the BCS TAE exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the BCS TAE exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (ISTQB Certified Tester Advanced Level-Test Automation Engineering) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA TAE test is available at CertsTopics. Before purchasing it, you can also see the BCS TAE practice exam demo.

ISTQB Certified Tester Advanced Level-Test Automation Engineering Questions and Answers

Question 1

You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the 11thtest. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.

What is the MOST important FIRST step to be taken immediately afterthe abnormal occurred when executing the 11thtest?

Options:

A.

Re-run the test automation suite starting from the 12thtest

B.

Return the database to a consistent state that allows subsequent test to run

C.

Take a backup of the database in its current state. So It can be analyzed later

D.

Re-run the test automation suite starting from the 1sttest.

Buy Now
Question 2

A regression test suite consist of 500 test cases which are allexecuted manually. The business case for a pilot project is based on the adoption of test automation using a commercial tool that will reduce the execution time by a factor of 90% for 100% of the tests in the regression test suite. The pilot project lastedone month ( as planned) and you are currently its results. At the end of the pilot project, 40% of the regression tests have been automated and their execution time has been reduce by 60%.

Which of the following statements is TRUE in this scenario?

Options:

A.

Theduration of the pilot project was too short –it should last unit the success factors are achieved

B.

The target defined for the business case is too accurate –it should not be measureable

C.

The project selected for the pilot is too critical –if should not be too critical or too trivial

D.

The target defined for the business case seems difficult to hit – it should be realistic

Question 3

A SUT has an existing automated test suite.

Which of the following statements relating to the introduction of new features in the SUT is TRUE?

Options:

A.

Automated tests are not affected by the introduction of a new feature and running them against the new SUT is a waste of effort

B.

The introduction of a new feature could require updates or additions to the testware components

C.

The test automation engineer should work with the business analysts to ensure the new feature is testable

D.

It is generally more difficult to automate test cases for a new feature as the developmenthas not yet started