Big Cyber Monday Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

PEGACPRSA22V1 Exam Dumps : Certified Pega Robotics System Architect 22

PDF
PEGACPRSA22V1 pdf
 Real Exam Questions and Answer
 Last Update: Dec 7, 2025
 Question and Answers: 101 With Explanation
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
PEGACPRSA22V1 exam
PDF + Testing Engine
PEGACPRSA22V1 PDF + engine
 Both PDF & Practice Software
 Last Update: Dec 7, 2025
 Question and Answers: 101
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
PEGACPRSA22V1 Engine
 Desktop Based Application
 Last Update: Dec 7, 2025
 Question and Answers: 101
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

Certified Pega Robotics System Architect 22 Questions and Answers

Question 1

The business requirement states the solution should update and save the address to all applicable applications in the solution. The interaction configuration file is already configured with the SaveAddress activity. You are now ready to add an Activity component to a project using standard naming conventions.

Which option meets the requirement for configuring the Activity component?

Options:

A.

Exhibit A

B.

Exhibit B

C.

Exhibit C

D.

Exhibit D

Buy Now
Question 2

Pega Robot Studio has several methods to manage the flow of an automation depending on when a control is matched.

In the Answer Area, drag the description on the left to its matching Design Block.

Options:

Question 3

When maintaining a robotic project, you encounter two separate issues with matching. In the first issue, the hierarchy of a web page has changed, and the control no longer matches. In the other issue, the control has multiple match rules, and one fails to match the control. Which two of the following interrogation methods can you use to resolve the matching issues in the project? (Choose Two)

Options:

A.

Refresh Matching

B.

Debug Control

C.

Debug Matching

D.

Replace Matching

E.

Replace Control