Nutanix Related Exams
NCP-DS Exam
Refer to the exhibit.

An administrator has been informed that a new workload will be deployed in six months with these characteristics.
• CPU: 210 GHz
• Memory: 600 GiB
• Storage:11.72 TiB
Upon receiving the new project notification, the administrator creates a scenario to determine whether or not the Nutanix cluster has enough space capacity to properly handle the new workload.
Why is the Overall Cluster runway showing that cluster resources are not exhausted (red color)?
An administrator is implementing a storage solution with these requirements:
• Is easily searchable
• Natively supports disaster recovery • Access to each item needs to be fast
• Can scale to petabytes of data
• Users are granted access after authentication • User data is isolated, but could be shared
How should the administrator satisfy these requirements?
A company uses a Nutanix 3-node cluster environment. In Prism Pro, the Capacity Runway
shows these capacity values:Max Capacity 6 TiB Effective Capacity 4 TiB
The company wants to upgrade the environment to use an RF3 container and also requires all
cluster nodes to be the same model.
What must the effective capacity of the Nutanix cluster be to support the new RF3 container?