Power Up Your Study Prep: Black Friday 75% Discount! Use coupon code below to save! - Ends in 0d 00h 00m 00s - Coupon code: big75certs

Note! Following H19-424_V1.0 Exam is Retired now. Please select the alternative replacement for your Exam Certification.

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

HCSP-Presales-Campus Network Planning and Design V1.0 Questions and Answers

Question 1

In iMaster NCE-Campus V300R022C00, the function description of the distributed switch (remote module) scenario is incorrect ()

Options:

A.

O&M capability: support restart operations on distributed switches: support reporting alarms for failed upgrade of distributed switches. Control capability: Configurations can be directly delivered to distributed switches (remote modules).

B.

Control capability: support direct configuration delivery to distributed switches (remote modules).

C.

Management capability: You can view the information of the distributed switch based on the central switch, including the ESN, model, online status, interface directly connected to the central switch, and the port list information of the distributed switch itself.

D.

Monitoring capability: You can view the memory usage, storage space usage, and temperature of distributed switches, as well as the running status, rate, flow rate, packet statistics, and bandwidth utilization of distributed switch ports.

Buy Now
Question 2

In the V200R022 version of the S switch, the description of the S5X31(S)-S multi-rate switch is wrong ()

Options:

A.

Support 2G large cache to cope with high burst business traffic.

B.

It can be used as a remote module for the central switch to achieve simplified networking.

C.

It supports advanced features such as VxLAN and MPLS, real-time telemetry data collection, and network O&M visualization, which can be widely used in scenarios such as medium-sized campus aggregation and small campus cores.

D.

3 power supply design, support N+1 redundancy, full 802.3bt90W PoE++ power supply for all ports, and the maximum PoE output power of the whole machine can reach 2268W, adapting to the power supply needs of massive terminals.

Question 3

The description of the dual-border and WAC interconnection design of the campus distributed gateway is incorrect ()

Options:

A.

In the overlay interconnection solution, it is recommended to run the VRRP VRRP virtual address between the two borders as the gateway for wireless users

B.

During wireless centralized forwarding, the WAC and the border need to manage IP communication and service VLAN communication, that is, the underlay and overlay need to be connected.

C.

During wireless local forwarding, only the management IP address needs to be communicated between the WAC and the border, that is, the underlay is connected.

D.

Supported networking: WAC dual-node hot standby (VRRP dual-node hot standby or dual-link hot standby), and dual-border port sub-networking, recommended dual-node VRRP hot standby: In multi-campus interconnection LAN-WAN convergence scenarios, refer to the following topology