Halloween Sale Special - 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: big75certs

Note! Following H19-424_V1.0 Exam is Retired now. Please select the alternative replacement for your Exam Certification.

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

HCSP-Presales-Campus Network Planning and Design V1.0 Questions and Answers

Question 1

The description of the dual-border and WAC interconnection design of the campus distributed gateway is incorrect ()

Options:

A.

In the overlay interconnection solution, it is recommended to run the VRRP VRRP virtual address between the two borders as the gateway for wireless users

B.

During wireless centralized forwarding, the WAC and the border need to manage IP communication and service VLAN communication, that is, the underlay and overlay need to be connected.

C.

During wireless local forwarding, only the management IP address needs to be communicated between the WAC and the border, that is, the underlay is connected.

D.

Supported networking: WAC dual-node hot standby (VRRP dual-node hot standby or dual-link hot standby), and dual-border port sub-networking, recommended dual-node VRRP hot standby: In multi-campus interconnection LAN-WAN convergence scenarios, refer to the following topology

Buy Now
Question 2

The source of policy generation does not include ()

Options:

A.

IGP

B.

CLI/Netconf/yang

C.

BGP

D.

PCEP

Question 3

Regarding planning and design tools, the following statements are wrong

Options:

A.

The planning and design tool is used for after-sales planning and cannot be used before sales

B.

When the equipment model cannot be used, you can feedback it in the tool platform

C.

The tool can ensure the logical consistency and data consistency of the design

D.

In the case of large or frequent changes in the network, the old project can be retained and the new project can be designed