Spring Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

H19-424_V1.0 Exam Dumps : HCSP-Presales-Campus Network Planning and Design V1.0

PDF
H19-424_V1.0 pdf
 Real Exam Questions and Answer
 Last Update: Feb 13, 2026
 Question and Answers: 107
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
H19-424_V1.0 exam
PDF + Testing Engine
H19-424_V1.0 PDF + engine
 Both PDF & Practice Software
 Last Update: Feb 13, 2026
 Question and Answers: 107
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
H19-424_V1.0 Engine
 Desktop Based Application
 Last Update: Feb 13, 2026
 Question and Answers: 107
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

HCSP-Presales-Campus Network Planning and Design V1.0 Questions and Answers

Question 1

The following scenarios in the CloudCampus solution do not belong to external network interconnection:

Options:

A.

L3 shared exit

B.

L3 exclusive export

C.

Shared export

D.

L2 exclusive export

Buy Now
Question 2

In the V200R022 version of the S switch, the description of the S5X31(S)-S multi-rate switch is wrong ()

Options:

A.

Support 2G large cache to cope with high burst business traffic.

B.

It can be used as a remote module for the central switch to achieve simplified networking.

C.

It supports advanced features such as VxLAN and MPLS, real-time telemetry data collection, and network O&M visualization, which can be widely used in scenarios such as medium-sized campus aggregation and small campus cores.

D.

3 power supply design, support N+1 redundancy, full 802.3bt90W PoE++ power supply for all ports, and the maximum PoE output power of the whole machine can reach 2268W, adapting to the power supply needs of massive terminals.

Question 3

In iMaster NCE-Campus V300R022C00, the function description of the distributed switch (remote module) scenario is incorrect ()

Options:

A.

O&M capability: support restart operations on distributed switches: support reporting alarms for failed upgrade of distributed switches. Control capability: Configurations can be directly delivered to distributed switches (remote modules).

B.

Control capability: support direct configuration delivery to distributed switches (remote modules).

C.

Management capability: You can view the information of the distributed switch based on the central switch, including the ESN, model, online status, interface directly connected to the central switch, and the port list information of the distributed switch itself.

D.

Monitoring capability: You can view the memory usage, storage space usage, and temperature of distributed switches, as well as the running status, rate, flow rate, packet statistics, and bandwidth utilization of distributed switch ports.