Summer Certification Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

H13-629_V2.5 Exam Dumps : HCIE-Storage (Written) v2.5

PDF
H13-629_V2.5 pdf
 Real Exam Questions and Answer
 Last Update: Sep 3, 2026
 Question and Answers: 343 With Explanation
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
H13-629_V2.5 exam
PDF + Testing Engine
H13-629_V2.5 PDF + engine
 Both PDF & Practice Software
 Last Update: Sep 3, 2026
 Question and Answers: 343
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
H13-629_V2.5 Engine
 Desktop Based Application
 Last Update: Sep 3, 2026
 Question and Answers: 343
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

HCIE-Storage (Written) v2.5 Questions and Answers

Question 1

Existing set customer of database uses a raw device, due to the large amount of data in the database. The customer plans to replace the old storage with new storage devices.

In the process of environmental inspection lvcb engineers found the following:

#getlvcb -TA sjklv

Intrapolicy =

copies = 0

interpolicy =

lvid =

lvname =

label =

machine id =

number Ips = 0

relocatable =

strict =

stripe width = 0

stripe size in exponent = 0

type =

upperbound = 0

fs =

time created = time modified =

As the vg is too large, the expansion of vg is impossible. As the service window is very short, and customers do not want to avoid the risk of large adjustments of the whole original environment, what is the recommended approach?

Options:

A.

Based on lvcb offset reconstruction nude equipment, and the database level 0 backup import

B.

Use the dd command for data migration

C.

Use the cplv command for data migration

D.

Use migratepv for data migration

Buy Now
Question 2

An Engineer installed a OceanStor 9000 for a customer (a total of 5 OceanStor 9000 C Node, front and rear ends are 10GE TOE networking, on-site installation TOE network card). Then connected the signal lines, power lines, and debugged the software. During the installation there were issues. Which of the following description of these issues are correct? (Multiple choice.)

Options:

A.

5 devices TOE NIC A0, B1, and A0, B3 inserted into the PCIe slot will not affect the system. Deployment will not affect the network bandwidth, so it cannot be adjusted.

B.

The signal cables are long and need to be strapped to the cabinet or placed on the bottom tray.

C.

Label NODE 01 A0-0 The signal cable is inserted in the network port A0-1. The signal cable labeled NODE01 B3-1 is inserted in the network position B3-0, due to the same network card two network port peer, you can place the wrong line, you cannot adjust.

D.

CE6850 switch connected to two stacked copper cables, one of which is needed to post-cold more cold, because it does not affect the network interoperability. You can base this software debugging.

Question 3

In a manual recovery process, which of the following operations is not required? (Multiple choice.)

Options:

A.

Stop the current production business, delete the host mapping.

B.

Adding the remote device to the original production side array.

C.

With the disaster recovery array as the master LUN and the original production array as the slave LUN, create the remote replication relationship between the DR and the production end and wait for the initial synchronization to be completed.

D.

Make an incremental synchronization.

E.

Delete the original production array consistency group.