Summer Certification Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

H13-629 Exam Dumps : HCIE-Storage (Written)

PDF
H13-629 pdf
 Real Exam Questions and Answer
 Last Update: Jun 26, 2026
 Question and Answers: 364 With Explanation
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
H13-629 exam
PDF + Testing Engine
H13-629 PDF + engine
 Both PDF & Practice Software
 Last Update: Jun 26, 2026
 Question and Answers: 364
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
H13-629 Engine
 Desktop Based Application
 Last Update: Jun 26, 2026
 Question and Answers: 364
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

HCIE-Storage (Written) Questions and Answers

Question 1

OceanStor 18000 hot backup strategy is set to high, all using 1TB hard drive when the hard disk domain, respectively, eight hard drives, 80 hard drives, 180 Hard disk, 280 hard disk, the system will be assigned how much hot spare space, in Terabytes?

Options:

A.

1,7,8,9

B.

1,7,15,24

C.

1,4,8,9

D.

1,5,7,9

Buy Now
Question 2

Which of thefollowing statement about RAID 2.0 is correct? (Multiple choice.)

Options:

A.

The hard disk is divided into chunks.

B.

Lun consists of extend or grain

C.

A CKG chunk may come from the same hard disk.

D.

Chunk in a CKG may come from a different storage pool.

Question 3

Existing set customer of database uses a raw device, due to the large amount of data inthe database. The customer plans to replace the old storage with new storage devices.

In the process of environmental inspection lvcb engineers found the following:

#getlvcb -TA sjklv

Intrapolicy =

copies = 0

interpolicy =

lvid =

lvname =

label =

machine id =

number Ips = 0

relocatable =

strict =

stripe width = 0

stripe size in exponent = 0

type =

upperbound = 0

fs =

time created = time modified =

As the vg is too large, the expansion of vg is impossible. As the service window is very short, and customersdo not want to avoid the risk of large adjustments of the whole original environment, what is the recommended approach?

Options:

A.

Based on lvcb offset reconstruction nude equipment, and the database level 0 backup import

B.

Use the dd command for data migration

C.

Use the cplv command for data migration

D.

Use migratepv for data migration