APC Related Exams
DU0-001 Exam

What are three data center attributes that impact the selection of a fire protection system? (Choose three.)
Consider a data center installation where circuit panels are installed at the end of each row of IT racks. Conduit is then run from power distribution units (PDUs) to the circuit panels and then to a subset of connections to the racks.
What are the two primary advantages to this power cabling approach? (Choose two.)
What is the critical element of a conventional starter motor in a generator?