Cisco Related Exams
300-110 Exam
A wireless engineer is preparing for a meeting with a customer to discuss a new wireless network design. The customer is a company that develops code and occupies a three-story building. Which two information points does a pre-site survey questionnaire contain? (Choose two.)
Refer to the exhibit. A network engineer is designing a high availability SSO on a Cisco Catalyst 9800-40 WLC with multi-LAG network redundancy on two Catalyst 9300 switches. The LAG requirements are: • Each LAG must be connected to a single switch. • Different VLANs must be assigned to different LAGs. • The controller must learn the identity of partners that can support LAG capabilities in each port. • When any active LAG ports fail, a standby LAG port must provide redundancy. Which protocol must be used for the port channel on the interface to meet the design requirements?
An engineer is performing an AP-on-a-stick survey and finds that the 5 GHz channel overlap is too high when an appropriate number of APs are used for the density requirements. Which two actions during the survey reduce channel overlap? (Choose two.)