Winter Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

ISTQB ATM Exam With Confidence Using Practice Dumps

Exam Code:
ATM
Exam Name:
ISTQB Certified Tester Advanced Level - Test Manager [Syllabus 2012]
Certification:
Vendor:
Questions:
64
Last Updated:
Dec 7, 2024
Exam Status:
Stable
ISTQB ATM

ATM: ISTQB Test Manager Exam 2024 Study Guide Pdf and Test Engine

Are you worried about passing the ISTQB ATM (ISTQB Certified Tester Advanced Level - Test Manager [Syllabus 2012]) exam? Download the most recent ISTQB ATM braindumps with answers that are 100% real. After downloading the ISTQB ATM exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the ISTQB ATM exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the ISTQB ATM exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (ISTQB Certified Tester Advanced Level - Test Manager [Syllabus 2012]) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA ATM test is available at CertsTopics. Before purchasing it, you can also see the ISTQB ATM practice exam demo.

ISTQB Certified Tester Advanced Level - Test Manager [Syllabus 2012] Questions and Answers

Question 1

In your organization the following tools of the same vendor are currently in usE. a requirements management tool, a test management tool and a bug tracking tool.

You are the Test Manager.

You are currently evaluating a test automation tool of the same vendor (to complete the vendor's tool suite) against an interesting open-source test automation tool under the GNU GPL (General Public License).

There are no initial costs associated to that open-source tool.

Which of the following statements associated to the selection of the open-source tool is correct in this scenario?

K2 1 credit

Options:

A.

The open-source tool can be modified but only if the community of developers of that tool gives you the formal permission to modify it

B.

There are no initial costs for the open-source tool but you should carefully consider the costs associated to the integration with the existing tools and also evaluate the recurring costs

C.

There are no initial costs for the open-source tool because open-source tools are usually low-quality, while vendor tools have always a better quality than the corresponding open-source tools

D.

The open-source tool can be modified but it can’t be distributed further in any way

Buy Now
Question 2

Assume you are a Test Manager involved in system testing of a CRM application for a Pay-TV company. Currently the application is able to support a proper number of users assuring the required responsiveness. Since the business is expected to grow, you have been asked to evaluate the ability of the application to grow to support more users while maintaining the same responsiveness.

Which of the following tools would you expect to be the most useful at performing this evaluation?

K2 1 credit

Options:

A.

Coverage tools

B.

Test management tools

C.

Static analysis tools

D.

Performance tools

Question 3

You are the Test Manager of a project that adopts a V-model with four formal levels of testinG. unit, integration, system and acceptance testing.

On this project reviews have been conducted for each development phase prior to testing, which is to say that reviews of requirements, functional specification, high-level design, low-level design and code have been performed prior to testing.

Assume that no requirements defects have been reported after the release of the product.

Which TWO of the following metrics do you need in order to evaluate the requirements reviews in terms of phase containment effectiveness?

K3 2 credits

Options:

A.

Number of defects found during the requirements review

B.

Total number of defects attributable to requirements found during unit, integration, system and acceptance testing

C.

Total number of defects found during functional specification review, high-level design review, low-level design review, code review, unit testing, integration testing, system testing and acceptance testing

D.

Time to conduct the requirements review

E.

Total number of defects attributable to requirements, found during functional specification review, high-level design review, low-level design review, code review, unit testing, integration testing, system testing and acceptance testing