New Year Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Huawei H13-624_V5.5 Exam With Confidence Using Practice Dumps

Exam Code:
H13-624_V5.5
Exam Name:
HCIP-Storage V5.5
Certification:
Vendor:
Questions:
106
Last Updated:
Dec 20, 2025
Exam Status:
Stable
Huawei H13-624_V5.5

H13-624_V5.5: HCIP-Storage Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the Huawei H13-624_V5.5 (HCIP-Storage V5.5) exam? Download the most recent Huawei H13-624_V5.5 braindumps with answers that are 100% real. After downloading the Huawei H13-624_V5.5 exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the Huawei H13-624_V5.5 exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the Huawei H13-624_V5.5 exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (HCIP-Storage V5.5) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA H13-624_V5.5 test is available at CertsTopics. Before purchasing it, you can also see the Huawei H13-624_V5.5 practice exam demo.

HCIP-Storage V5.5 Questions and Answers

Question 1

Assume a financial customer purchases a Huawei OceanStor Pacific scale-out storage system for future service deployment. Which statement is false about software installation of the storage system?

Options:

A.

During block service installation, if management nodes are deployed where compute and storage nodes are converged, the number of vCPUs on each converged compute and storage node must be greater than or equal to 20.

B.

During block service installation, if converged deployment of storage and compute nodes is required, the difference between the disk quantities on any two nodes in the same storage pool cannot be greater than 2 or 30% of the disk quantity on the node having most disks.

C.

If wizard-based software installation is used, an engineer must manually add nodes, configure networks, and create a control cluster on DeviceManager, and then install the OceanStor Pacific series software.

D.

To install the Distributed Parallel Client (DPC), the memory required for running the DPC software on a compute node must be greater than or equal to 20 GB.

Buy Now
Question 2

When delivering Huawei all-flash projects, Huawei engineers introduced the HyperCDP feature of flash storage to customers. Which of the following statements are true about this feature?

Options:

A.

Copies created using HyperCDP can be used for data analysis and application testing.

B.

When an application server sends a request to write data to the source LUN after a HyperCDP snapshot is created, the storage system uses the copy-on-write (COW) technology to save the new data to a new location in the storage pool and directs the source LUN’s pointer to the new location.

C.

HyperCDP snapshots cannot be directly mapped to hosts. To read data from a HyperCDP snapshot due to actual service requirements, the administrator needs to share the file system with the host so that the host can read the source file system data at the point in time when the HyperCDP snapshot was created.

D.

HyperCDP is a high-density snapshot and requires the system to construct file system objects. Therefore, the system memory usage is high.

Question 3

A financial customer purchases Huawei OceanStor Pacific 9950 for service deployment. During a routine inspection, an engineer finds that a main storage disk of the device is faulty and uses SmartKit to replace it. Which of the following statements is true about replacing the disk?

Options:

A.

When removing the disk, the engineer needs to remove it from its connector, wait at least 60 seconds, and then remove the disk from the chassis.

B.

Before using SmartKit to replace the disk, the engineer needs to complete the pre-processing as prompted. After that, the engineer can continue the subsequent operations.

C.

The duration from removing the main storage disk to installing a normal one on the node cannot exceed 10 minutes. Otherwise, heat dissipation of the storage device will be affected.

D.

The interval between removing the faulty disk and inserting a normal one is at least 10 seconds. Otherwise, the disk may be damaged.