Big 11.11 Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Cisco 350-601 Exam With Confidence Using Practice Dumps

Exam Code:
350-601
Exam Name:
Implementing Cisco Data Center Core Technologies (350-601 DCCOR)
Certification:
Vendor:
Questions:
305
Last Updated:
Nov 16, 2025
Exam Status:
Stable
Cisco 350-601

350-601: CCNP Data Center Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the Cisco 350-601 (Implementing Cisco Data Center Core Technologies (350-601 DCCOR)) exam? Download the most recent Cisco 350-601 braindumps with answers that are 100% real. After downloading the Cisco 350-601 exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the Cisco 350-601 exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the Cisco 350-601 exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (Implementing Cisco Data Center Core Technologies (350-601 DCCOR)) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA 350-601 test is available at CertsTopics. Before purchasing it, you can also see the Cisco 350-601 practice exam demo.

Implementing Cisco Data Center Core Technologies (350-601 DCCOR) Questions and Answers

Question 1

Refer to the exhibit An engineer must capture fiber channel traffic from the

server and the supervisory to the Cisco MDS 9000 Series Switch Fabric.

The traffic must be forwarded to the analyzer. Drag and drop the

code snippets from the right onto the blanks in the code on the

left to complete the configuration. Not all code snippets are used

Options:

Buy Now
Question 2

Refer to the exhibit. An engineer must invoke a Python script that alerts the operations team when the router DC-RTR-1 becomes unreachable. Which configuration set accomplishes this task?

Options:

A.

track 3 ip sla 10 reachability

event name GATEWAY-DOWN

event state down

action cli command routerdown.py

B.

scheduler job name ROUTER-DOWN

job track 9 state down

action 1.0 cli source routerdown.py

schedule 10

C.

event scheduler name DOWN-ROUTER

event track 2 state 1 not up

event action 1.0 command source routerdown.py

event start 0:00 repeat 0:05

D.

event manager applet ROUTER-DOWN-SLA

event track 5 state down

action 1.0 event-default

action 2.0 cli command source routerdown.py

Question 3

What happens when the install all epid bootflash:m9000-pkg2-9.2.2.epid module all fan-module all bar all command is run on the Cisco MDS 9000 Series Director Switch?

Options:

A.

The active supervisor updates first

B.

Fan modules power cycle

C.

The switching module starts a rolling update

D.

Each module updates and power cycles