Winter Sale - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

Cisco 350-601 Exam With Confidence Using Practice Dumps

Exam Code:
350-601
Exam Name:
Implementing Cisco Data Center Core Technologies (350-601 DCCOR)
Certification:
Vendor:
Questions:
305
Last Updated:
Jan 21, 2026
Exam Status:
Stable
Cisco 350-601

350-601: CCNP Data Center Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the Cisco 350-601 (Implementing Cisco Data Center Core Technologies (350-601 DCCOR)) exam? Download the most recent Cisco 350-601 braindumps with answers that are 100% real. After downloading the Cisco 350-601 exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the Cisco 350-601 exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the Cisco 350-601 exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (Implementing Cisco Data Center Core Technologies (350-601 DCCOR)) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA 350-601 test is available at CertsTopics. Before purchasing it, you can also see the Cisco 350-601 practice exam demo.

Implementing Cisco Data Center Core Technologies (350-601 DCCOR) Questions and Answers

Question 1

A network architect considers a Cisco HyperFlex design

solution for a company. The proposed solution is for a virtual environment that is not performance-sensitive, but the solution must have high storage capacity and a low cost. Which Cisco HyperFlex storage configuration should be used?

Options:

A.

All-Flash

B.

Hybrid

C.

All-SAN

D.

All-NVMe

Buy Now
Question 2

What is the impact of an EPLD upgrade on a Cisco MDS 9000 Series Switch?

Options:

A.

The active supervisor traffic is disrupted.

B.

The upgrade disrupts the management connectivity to the switch.

C.

The standby supervisor module reloads multiple times.

D.

The upgrade process disrupts only the module that is being upgraded.

Question 3

Refer to the exhibit An engineer must provision a VXLAN deployment The OSPF has already been configured as the underlay protocol All BGP configurations will be performed using the template method The deployment must meet these requirements

    The local update source for leaf switches must be loopback 1

    The router ID must be the local loopback IP address

    The external BGP connections must use a template name

Drag and drop the configuration snippets from the bottom to complete the configuration

Options: