Summer Certification Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Cisco 300-620 Exam With Confidence Using Practice Dumps

Exam Code:
300-620
Exam Name:
Implementing Cisco Application Centric Infrastructure (300-620 DCACI)
Certification:
Vendor:
Questions:
247
Last Updated:
Jun 21, 2026
Exam Status:
Stable
Cisco 300-620

300-620: CCNP Data Center Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the Cisco 300-620 (Implementing Cisco Application Centric Infrastructure (300-620 DCACI)) exam? Download the most recent Cisco 300-620 braindumps with answers that are 100% real. After downloading the Cisco 300-620 exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the Cisco 300-620 exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the Cisco 300-620 exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (Implementing Cisco Application Centric Infrastructure (300-620 DCACI)) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA 300-620 test is available at CertsTopics. Before purchasing it, you can also see the Cisco 300-620 practice exam demo.

Implementing Cisco Application Centric Infrastructure (300-620 DCACI) Questions and Answers

Question 1

Network engineer configured a Cisco ACI fabric as follows:

• An EPG called EPG-A is created and associated with a VMM domain called North. •The EPG-A is associated with BD-A and is in an application profile called Apps-A.

• The BD-A is associated with VRF-1 in the Prod tenant.

Which port group must be selected to place VMs in EPG-A?

Options:

A.

Prod|VRF-1 |Apps-A|EPG-A

B.

Prod|Business_Apps|BD-A|EPG-A

C.

Prod|Apps-A|North|EPG-A

D.

Prod|Apps-A|EPG-A

Buy Now
Question 2

Refer to the exhibit.

A customer is deploying a WAN with these requirements: •Routers 1 and 2 must receive only routes 192.168.11.0/24 and 192.168.21.0724 from the Cisco ACI fabric •Reachability to the WAN users must be permitted only for the servers that are located in vrf_prod.

Which settings must be configured to meet these objectives?

Options:

A.

Configure the subnets 192.168.11.0/24 and 192.168.21.0/24 as Private to VRF Configure the subnet 192.168.31.0/24 as Advertised Externally. Configure an EPG subnet 0.0.0.0/0 as External Subnets for External EPG.

B.

Configure the subnets 192.168.11.0/24 and 192.168.21.0/24 as Private to VRF. Configure the subnet 192.168.31.0/24 as Advertised Externally. Configure an EPG subnet 0.0.0.0/0 as Shared Route Control Subnet.

C.

Configure the subnets 192.168.11.0/24 and 192.168.21.0/24 as Advertised Externally.

Configure the subnet 192.168.31.0/24 as Private to VRF.

Configure an EPG subnet 0.0.0.0/0 as Shared Route Control Subnet.

D.

Configure the subnets 192.168.11.0/24 and 192.168.21.0/24 as Advertised Externally.

Configure the subnet 192.168.31.0/24 as Private to VRF.

Configure an EPG subnet 0.0.0.0/0 as External Subnets for External EPG.

Question 3

What are two requirements for the IPN network when implementing a Multi-Pod ACI fabric? (Choose two.)

Options:

A.

EIGRP routing

B.

PIM ASM multicast routing

C.

BGP routing

D.

VLAN ID 4

E.

OSPF routing