Winter Sale - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

Cisco 300-615 Exam With Confidence Using Practice Dumps

Exam Code:
300-615
Exam Name:
Troubleshooting Cisco Data Center Infrastructure (300-615 DCIT)
Certification:
Vendor:
Questions:
167
Last Updated:
Jan 23, 2026
Exam Status:
Stable
Cisco 300-615

300-615: CCNP Data Center Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the Cisco 300-615 (Troubleshooting Cisco Data Center Infrastructure (300-615 DCIT)) exam? Download the most recent Cisco 300-615 braindumps with answers that are 100% real. After downloading the Cisco 300-615 exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the Cisco 300-615 exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the Cisco 300-615 exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (Troubleshooting Cisco Data Center Infrastructure (300-615 DCIT)) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA 300-615 test is available at CertsTopics. Before purchasing it, you can also see the Cisco 300-615 practice exam demo.

Troubleshooting Cisco Data Center Infrastructure (300-615 DCIT) Questions and Answers

Question 1

Refer to the exhibit.

A client configures an upgrade of its Cisco Nexus switches that are connected to the Cisco ACI controller, such that the switches are upgraded one at a time. After the upgrade is run, it is discovered that both Cisco Nexus switches were upgraded simultaneously. Which two actions ensure that the switches upgrade one at a time? (Choose two.)

Options:

A.

Configure the *Do not pause on failure and do not wait on cluster health" Run Mode

B.

Choose the 'Pause upon upgrade failure" Run Mode

C.

Select the "Graceful Maintenance" checkbox

D.

Place each leaf switch in a different upgrade group

E.

Check the Ignore Compatibility" checkbox

Buy Now
Question 2

Refer to the exhibit.

An engineer is configuring boot from iSCSI on a Cisco UCS B-Series Blade Server, but the LUN fails to mount. Which action resolves the issue?

Options:

A.

Statically configure the target information in the Boot Policy.

B.

Configure an MTU size of 9000 on the appliance port.

C.

Configure a QoS policy on the vNIC.

D.

Set a connection timeout value of 250 in the iSCSI Adapter Policy.

Question 3

Drag and drop the Cisco UCS SNMP fault types from the left onto the correct issues on the right.

Options: