Veritas Related Exams
VCS-278 Exam
An administrator creates a Storage Lifecycle Policy (SLP) to take advantage of optimized duplication. The backup and subsequent duplication jobs launch as configured in the SLP.
What may cause the secondary duplication job to run as non-optimized?
An administrator has a scheduled policy that backs up 20 clients, each with multiple mount points and multiple data streams enabled. One of the jobs has failed and is in an Incomplete state in the Activity Monitor.
How should the administrator verify the incomplete job runs prior to the next scheduled backup?
An administrator wants to use a client as the VMware backup host.
Where is the name of the VMware backup host entered in NetBackup?