Big 11.11 Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

NS0-516 Exam Dumps : NetApp Certified Implementation Engineer - SAN Specialist - E-Series

PDF
NS0-516 pdf
 Real Exam Questions and Answer
 Last Update: Nov 8, 2025
 Question and Answers: 64 With Explanation
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
NS0-516 exam
PDF + Testing Engine
NS0-516 PDF + engine
 Both PDF & Practice Software
 Last Update: Nov 8, 2025
 Question and Answers: 64
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
NS0-516 Engine
 Desktop Based Application
 Last Update: Nov 8, 2025
 Question and Answers: 64
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

NetApp Certified Implementation Engineer - SAN Specialist - E-Series Questions and Answers

Question 1

A junior administrator recently made changes to an E-Series system. As a result of these changes, the management host lost the ability to manage the E-Series system through in-band management, but the host still has access to the E-Series data volumes.

In this scenario, what caused this issue?

Options:

A.

The access volume was un-mapped

B.

The management IPs were changed

C.

The ownership of the management host’s volumes changed

D.

Auto Load Balancing was disabled

Buy Now
Question 2

Click the Exhibit button.

A customer’s host is running a Red Hat Enterprise Linux 7.6 server with dm-mp configured for ALUA and is connected to a single volume on the EF280 system that is shown in the exhibit.

In this scenario, how many active/optimized paths are available to the volume?

Options:

A.

2

B.

8

C.

4

D.

6

Question 3

An administrator is asked to migrate two DE6600 shelves into a newly deployed E5760 environment that is configured with a stack of two DE460C shelves.

In this scenario, how does the administrator complete this task?

Options:

A.

Cable the DE6600s at the beginning of the stack

B.

Cable the DE6600s into a separate stack

C.

Cable the DE6600s at the end of the stack

D.

Cable the DE6600s between the DE460C shelves