Labour Day Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

Netapp NS0-516 Dumps

Page: 1 / 2
Total 64 questions

NetApp Certified Implementation Engineer - SAN Specialist - E-Series Questions and Answers

Question 1

Click the Exhibit button.

Referring to the exhibit, which three steps would you take to solve the problem shown in the event log? (Choose three.)

Options:

A.

Swap out the SFP in the controller port

B.

Swap out the FC cable

C.

Reinitialize the FC switch

D.

Move the connection to another controller port

E.

Swap out the HBA on the FC switch

Question 2

Which file contains the configuration for a multipath driver for FC on Linux systems?

Options:

A.

/etc/kernel/mp.conf

B.

/opt/multipath/multipath.cnf

C.

/etc/multipath.conf

D.

/etc/dm-multipath.conf

Question 3

Click the Exhibit button.

A customer’s host is running a Red Hat Enterprise Linux 7.6 server with dm-mp configured for ALUA and is connected to a single volume on the EF280 system that is shown in the exhibit.

In this scenario, how many active/optimized paths are available to the volume?

Options:

A.

2

B.

8

C.

4

D.

6

Question 4

Click the Exhibit button.

Referring to the exhibit, which SAS connector is supported on the NetApp E2800 E-Series family?

Options:

A.

1

B.

4

C.

2

D.

3

Question 5

A customer intends to use an E2812 system without expansion shelves. The specification for their Windows host requires that six E-Series data volumes be used.

In this scenario, how should the system be configured?

Options:

A.

one DDP with all the volumes

B.

three DDPs with the volumes divided equally

C.

one DDP for each volume

D.

two DDPs with the volumes divided equally

Question 6

A company wants the most scalable host-side connection topology for E-Series systems.

In this scenario, which FC topology would satisfy the requirement?

Options:

A.

direct connect

B.

fabric attach

C.

private loop

D.

arbitrated loop

Question 7

An administrator is asked to migrate two DE6600 shelves into a newly deployed E5760 environment that is configured with a stack of two DE460C shelves.

In this scenario, how does the administrator complete this task?

Options:

A.

Cable the DE6600s at the beginning of the stack

B.

Cable the DE6600s into a separate stack

C.

Cable the DE6600s at the end of the stack

D.

Cable the DE6600s between the DE460C shelves

Question 8

An administrator is asked to create an asynchronous mirroring environment that supports multiple mirroring relationships, each with different recovery point objectives (RPOs).

In this scenario, how does the administrator create this environment?

Options:

A.

The administrator creates a mirror group with the appropriate RPOs

B.

The administrator creates multiple mirror pairs, each with their own schedule and RPO

C.

The administrator creates a single consistency group with multiple RPOs

D.

The administrator creates multiple mirror consistency groups with the appropriate RPOs

Question 9

A junior administrator recently made changes to an E-Series system. As a result of these changes, the management host lost the ability to manage the E-Series system through in-band management, but the host still has access to the E-Series data volumes.

In this scenario, what caused this issue?

Options:

A.

The access volume was un-mapped

B.

The management IPs were changed

C.

The ownership of the management host’s volumes changed

D.

Auto Load Balancing was disabled

Page: 1 / 2
Total 64 questions