Summer Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

HQT-4180 Exam Dumps : Hitachi Vantara Qualified Professional - VSP Midrange Family Installation

PDF
HQT-4180 pdf
 Real Exam Questions and Answer
 Last Update: Sep 16, 2025
 Question and Answers: 35
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$29.75  $84.99
HQT-4180 exam
PDF + Testing Engine
HQT-4180 PDF + engine
 Both PDF & Practice Software
 Last Update: Sep 16, 2025
 Question and Answers: 35
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$47.25  $134.99
Testing Engine
HQT-4180 Engine
 Desktop Based Application
 Last Update: Sep 16, 2025
 Question and Answers: 35
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$35  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

Hitachi Vantara Qualified Professional - VSP Midrange Family Installation Questions and Answers

Question 1

A customer wants to change a production RAID group from RAID 5 (7D+1P) to RAID 6 (6D+2P) on a VSP G600 during normal operations. They have just unmapped the LUNs from the channel ports.

What needs to be performed next?

Options:

A.

Parity groups must be deleted.

B.

The RAID level must be changed in Storage Navigator.

C.

The RAID level in the SVP Maintenance window must be changed.

D.

The RAID 5 group must be put into DRU mode in Storage Navigator.

Buy Now
Question 2

You have to perform a firmware update containing new code for DKCMain, CHBs and drives on a VSP G900.

What are two requirements? (Choose two.)

Options:

A.

The CHBs must be updated first.

B.

The Microprocessor utilization should be below 50%.

C.

The Cache Write Pending rate should be below 30%.

D.

There should be no sparing processes running in the background.

Question 3

One Unix server and one Windows server share the front-end ports CL1-A and CL2-A of a VSP E590 system.

What are two requirements to separate the I/Os of the servers? (Choose two.)

Options:

A.

Both servers must be registered in two different Host Groups.

B.

Port security must be enabled on both ports.

C.

The Universal Volume Manager license must be installed.

D.

Two cache partitions must be created on the VSP for the servers.