Month End Sale Special - 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: big75certs

HPE7-V01 Exam Dumps : Advanced HPE Edge-to-Cloud Solutions

PDF
HPE7-V01 pdf
 Real Exam Questions and Answer
 Last Update: Sep 28, 2026
 Question and Answers: 50 With Explanation
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$21.25  $84.99
HPE7-V01 exam
PDF + Testing Engine
HPE7-V01 PDF + engine
 Both PDF & Practice Software
 Last Update: Sep 28, 2026
 Question and Answers: 50
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$33.75  $134.99
Testing Engine
HPE7-V01 Engine
 Desktop Based Application
 Last Update: Sep 28, 2026
 Question and Answers: 50
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$25  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

Advanced HPE Edge-to-Cloud Solutions Questions and Answers

Question 1

A customer requested a quote for a 64Gb Fibre Channel system between two data centers with a distance of 95 KM / 60 MI between the locations, with a requirement for 14 F-ports on each switch.

Refer to exhibit

Which statement is true about the given configuration?

Options:

A.

A Short Wave transceiver must be removed to install the Long Wave transceiver.

B.

A Fibre Channel license needs to be modified for Extended Fabric to support the required distance.

C.

A SFP56 or SFP56-DD port can be used for the Long Wave transceiver when all SFPs are inserted.

D.

A port range of 39 to 47 can be used for the LW transceiver if ports 0 to 23 are used for SW.

Buy Now
Question 2

You are designing a solution for a customer that will support a virtualization workload based on HPE Synergy. Your customer has the following requirements:

    Dual-socket HPE Synergy compute nodes running ESXi 8.x with maximum memory supported

    Each node should have access to shared storage from HPE Alletra Storage MP B10000

    All virtual machines should be protected against host failure

    All virtual machines with vGPU must be protected with Fault Tolerance

    All compute nodes should boot from disks located in the D3940 Storage Modules protected with RAID 1

    All frames should be managed as one logical enclosure to simplify management

    All compute nodes should support two network ports with the maximum Ethernet connectivity speed

You are reviewing a proposal that you must verify. The proposal consists of:

    3 x HPE Synergy 12000 frames

    2 x HPE Synergy Composer2 modules

    4 x HPE Virtual Connect SE 100Gb F32 Modules for Synergy

    4 x HPE Synergy 50Gb Interconnect Link Modules

    3 x HPE Synergy D3940 Storage Modules, each with 20 SSD drives

    1152 core VMware vSphere Enterprise Plus subscriptions

    36 x HPE Synergy 480 Gen11 compute nodes

Each SY480 Gen11 is configured with:

    A single Platinum CPU with 32 cores

    HPE Synergy 6820C 25/50Gb Converged Network Adapter

    HPE Synergy 5830C 32Gb Fibre Channel Host Bus Adapter

    HPE MR416i-o Gen11 12G SAS Mezzanine Controller

Which two statements are true regarding the proposal? (Select two.)

Options:

A.

2 HPE Synergy 50Gb Interconnect Link Modules should be removed from the proposal, as the total number of interconnects required is six.

B.

HPE MR416i-o Smart RAID controller can be removed because there are no external SAS disk enclosures included in the proposal.

C.

Two HPE Virtual Connect SE 100Gb F32 Modules for Synergy can be removed from the proposal because all requirements are met without them.

D.

To access HPE Alletra MP B10000 arrays, FC upgrade licenses for HPE Virtual Connect SE 100Gb F32 Modules for Synergy must be purchased.

E.

vSphere Enterprise Plus subscriptions can be replaced with vSphere Standard subscriptions.

Question 3

Your customer is planning to buy a new hardware platform for their HPC application.

They are considering an environment with 150 HPE Cray XD2000 systems with XD225v and XD220v servers.

Your customer has the following requirements for a management platform:

    Supports Ubuntu Linux 24.04 operating system

    Supports bare metal server operating system provisioning

    Has the ability to install operating system in parallel on multiple nodes

    Management platform is highly available

You are exploring HPE Performance Cluster Manager (HPCM) as a solution.

What statement is true in this scenario?

Options:

A.

HPE Performance Cluster Manager will fit the customer’s requirements.

B.

One server node must be reserved for the Admin Node.

C.

A different management solution must be used for parallel OS installation.

D.

The Slingshot network component must be added to the solution.