Refer to the exhibit.

An architect needs to plan a network solution for a new office building with four floors. Each floor has two wiring closets with the equipment shown in the exhibit. The switches will connect to employee desktops, a few campus APs controlled by MCs, and printers. The switches do not implement tunneled node.
What is a best practice design for the VLANs and subnets for the wired devices?
An architect proposes an Aruba solution with a hardware Mobility Master (MM) to a customer. The customer has a disaster recovery site which is connected to the main site at Layer 3. The customer requires the MM to remain available in case of a total site failure.
Which plan meets the customer requirements?
An architect needs to deliver an upgrade to an 802.11ac-based solution for a customer. The customer requires an active site survey for the new deployment. Which deliverable should the architect provide to the customer?