New Year Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

HPE6-A47 Exam Dumps : Designing Aruba Solutions

PDF
HPE6-A47 pdf
 Real Exam Questions and Answer
 Last Update: Jan 4, 2026
 Question and Answers: 65 With Explanation
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
HPE6-A47 exam
PDF + Testing Engine
HPE6-A47 PDF + engine
 Both PDF & Practice Software
 Last Update: Jan 4, 2026
 Question and Answers: 65
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
HPE6-A47 Engine
 Desktop Based Application
 Last Update: Jan 4, 2026
 Question and Answers: 65
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

Designing Aruba Solutions Questions and Answers

Question 1

Refer to the exhibit.

An architect needs to plan a network solution for a new office building with four floors. Each floor has two wiring closets with the equipment shown in the exhibit. The switches will connect to employee desktops, a few campus APs controlled by MCs, and printers. The switches do not implement tunneled node.

What is a best practice design for the VLANs and subnets for the wired devices?

Options:

A.

one VLAN per closet and a /24 subnet for each VLAN

B.

one VLAN per closet and a /25 subnet for each VLAN

C.

one VLAN for the entire building and a /23 subnet

D.

one VLAN per floor and a /24 subnet for each VLAN

Buy Now
Question 2

An architect proposes an Aruba solution with a hardware Mobility Master (MM) to a customer. The customer has a disaster recovery site which is connected to the main site at Layer 3. The customer requires the MM to remain available in case of a total site failure.

Which plan meets the customer requirements?

Options:

A.

Deploy a hardware MM to the disaster recovery site and set up VRRP between them.

B.

Deploy a hardware MM to the disaster recovery site and set its IP address as the standby master for MCs.

C.

Deploy the virtual MM (VMM) to the disaster recovery site and set the VMM IP address to the same address as the hardware MM.

D.

Deploy the virtual MM (VMM) to the disaster recovery site and configure clustering on the hardware and software appliances.

Question 3

An architect needs to deliver an upgrade to an 802.11ac-based solution for a customer. The customer requires an active site survey for the new deployment. Which deliverable should the architect provide to the customer?

Options:

A.

a heat map with proposed AP locations and actual tested coverage

B.

a heat map with existing AP locations and actual tested coverage

C.

a heat map with sources of RF interface, both 802.11 and non-802.11

D.

the heat map with proposed AP locations and predictive coverage