Winter Sale - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

HPE0-V14 Exam Dumps : Building HPE Hybrid IT Solutions (Rev. 19.41)

PDF
HPE0-V14 pdf
 Real Exam Questions and Answer
 Last Update: Dec 11, 2025
 Question and Answers: 303
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$29.75  $84.99
HPE0-V14 exam
PDF + Testing Engine
HPE0-V14 PDF + engine
 Both PDF & Practice Software
 Last Update: Dec 11, 2025
 Question and Answers: 303
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$47.25  $134.99
Testing Engine
HPE0-V14 Engine
 Desktop Based Application
 Last Update: Dec 11, 2025
 Question and Answers: 303
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$35  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

Building HPE Hybrid IT Solutions (Rev. 19.41) Questions and Answers

Question 1

Refer to the exhibit.

You are asked to review a server configuration for a customer before it is quoted. The server will be used in a business-critical environment and high availability is required. The server configuration is shown in the exhibit.

What should be added to the configuration to ensure availability?

Options:

A.

HPE Smart Array P408i-a SR Gen10 12 G SAS Modular Controller

B.

HPE DL380 Gen10 Intel Xeon-Gold 6143 (2.8 GHz/16-core/205 W) Processor Kit

C.

HPE 800W Flex Slot Platinum Hot Plug Low Halogen Power Supply Kit

D.

HPE DL38X Gen10 12 Gb SAS Expander Card Kit

Buy Now
Question 2

You are installing a server solution in a customer’s data center.

How can you ensure that the installation complies with relevant electrical best practices? (Choose two.)

Options:

A.

Use a single-phase, two-wire power receptacle with protective earth or ground (PE) to filter interference from the power grid

B.

Do not allow the overall system AC current load to exceed 80% of the branch circuit AC current rating

C.

Use fanout cables when connecting the server to the network for maximum electrical impedance

D.

Balance the server power load between available AC supply branch circuits

E.

Configure the server power to a single electrical circuit in the data center

Question 3

A customer is expanding from local storage to a SAN environment for the firt time. They plan to future proof their environment with a 16 Gb Fibre Channel. They also want to allow for future I/O expansion with new servers.

Identify the correct server and storage to meet the customer requirements.

Options: