Weekend Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

D-PWF-DS-23 Exam Dumps : Dell PowerFlex Design 2023 Exam

PDF
D-PWF-DS-23 pdf
 Real Exam Questions and Answer
 Last Update: Feb 9, 2025
 Question and Answers: 40 With Explanation
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
D-PWF-DS-23 exam
PDF + Testing Engine
D-PWF-DS-23 PDF + engine
 Both PDF & Practice Software
 Last Update: Feb 9, 2025
 Question and Answers: 40
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
D-PWF-DS-23 Engine
 Desktop Based Application
 Last Update: Feb 9, 2025
 Question and Answers: 40
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

Dell PowerFlex Design 2023 Exam Questions and Answers

Question 1

An administrator wants to configure SDTs to perform I/O with hosts that are going to use the NVMe over Fabric protocol What are three requirements to accomplish this task (Select 3)

Options:

A.

The Storage port must be configured with the host role

B.

The Discovery port must be configured with the storage role

C.

The NVMe Qualified Name of the hosts is known

D.

A minimum of two NVMe targets must be assigned to a Protection Domain.

E.

The storage rote and hosts role must be configured to the same target IP addresses

Buy Now
Question 2

An administrator is adding an NVMe device to an existing storage pool They provide the following details in the Add Storage Device to SDS dialog box

• Device Path /dev/disk/by-id'Dell_Express_Flash_NVMe_PM1725_V6TB_SFF_ _S2JPNA0J500141

• Device Name NVMe A. 1.6 TB

• Storage Pool SP-1

What is the result of this action'?

Options:

A.

The device addition fails due to an invalid path

B.

The device is named "NVMeAt 6 TB" and added to the Storage Pool "SP-1".

C.

The device name is truncated to "NVMe" and added lo the Storage Pool "SP-t"

D.

The device addition tails due to invalid characters in the name

Question 3

In a test-dev PowerFlex appliance environment, there are two Compute Only nodes five Storage Only nodes, and one Management node An architect wants to create Fault Sets using all available servers but is unable to do so What is the cause of this issue?

Options:

A.

A Mote than one Management node is required

B.

There are not enough Storage Only nodes.

C.

There are not enough Compute Only nodes.