Winter Sale - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

5V0-41.20 Exam Dumps : VMware SD-WAN Troubleshoot

PDF
5V0-41.20 pdf
 Real Exam Questions and Answer
 Last Update: Nov 19, 2025
 Question and Answers: 36
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$29.75  $84.99
5V0-41.20 exam
PDF + Testing Engine
5V0-41.20 PDF + engine
 Both PDF & Practice Software
 Last Update: Nov 19, 2025
 Question and Answers: 36
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$47.25  $134.99
Testing Engine
5V0-41.20 Engine
 Desktop Based Application
 Last Update: Nov 19, 2025
 Question and Answers: 36
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$35  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

What our customers are saying

Argentina certstopics Argentina
Mason
Oct 24, 2025
I appeared for the VMware 5V0-41.20 test and scored 91% on the very first attempt. I studied from certstopic as it has 100% real and valid practice questions available.

VMware SD-WAN Troubleshoot Questions and Answers

Question 1

Scenario 2:

After completing the branch activation activities for all required branches, the network administrator attempts to test connectivity between the various branches and between the hubs and branches. The administrator notices a lack of connectivity despite being certain that configurations have been complete. The administrator also observed that several users are reporting intermittent connectivity to some of the applications they are accessing. Other users are reporting no access to these applications. Other users at some of the branches claim they cannot get to certain public resources. The administrator wants to ensure that all sites can talk to each other and all resources are accessible.

Exhibit.

The tunnel from spoke to hub is not coming up. What are the two possible reasons? (Choose two.)

Options:

A.

Spoke Edge and hub Edge are two different Edge models.

B.

Spoke Edge and hub Edge have a mismatch certificate authentication mode.

C.

Hub WAN Interface might be behind the NAT Device or firewall.

D.

Dynamic Branch to Branch is not enabled.

Buy Now
Question 2

Scenario 2:

After completing the branch activation activities for all required branches, the network administrator attempts to test connectivity between the various branches and between the hubs and branches. The administrator notices a lack of connectivity despite being certain that configurations have been complete. The administrator also observed that several users are reporting intermittent connectivity to some of the applications they are accessing. Other users are reporting no access to these applications. Other users at some of the branches claim they cannot get to certain public resources. The administrator wants to ensure that all sites can talk to each other and all resources are accessible.

Exhibit.

A network administrator is trying to create multiple overlays on a single physical interface on an Edge. The administrator is able to bring up only a single overlay so far, but is having trouble with bringing up additional overlays.

What could be the possible reason?

Options:

A.

The administrator does not have the right permission to create multiple overlays. The administrator needs to have an Operator-level privilege for this task.

B.

On the WAN overlay configuration, verify the IP address, next-hop, and the VLAN ID configuration.

C.

The licensing does not support multiple overlays on a single physical interface.

D.

Multiple overlays cannot be created on a single physical interface. Multiple physical interfaces are needed.

Question 3

Scenario:1

A network administrator is tasked with enabling SD-WAN at three branch locations, A topology has been provided for reference. For each site, the administrator is having issues bringing edges online, as another administrator has gone ahead and created a configuration ahead of time. The organization has several branch sites. One is an Internet-only site and two are Hybrid locations with both internet and MPLS. The last location is MPLS only. There are hub data center in this environment as well. Please refer to the topology.

Exhibit.

One of the Edges at the Chicago site is unable to activate. The Edge has a red LED. What is the next troubleshooting step?

Options:

A.

If the Edge is connected to its HA peer, determine if there is a link-light on the HA peer-link.

B.

If the Edge is connected to the MPLS circuit, determine if the Hub is advertising gateway routes.

C.

If the Edge is connected to the MPLS circuit which does not have DHCP, determine if there is a static IP configuration that needs to be applied upon activation.

D.

If the Edge is connected to its HA peer, determine if underlay BGP peering is present between the two Edges.