VMware Related Exams
5V0-35.21 Exam
There is a planned project to move some workloads from a company's vSphere environment, which is running in their data center, to a public cloud. The vSphere environment is being monitored by vRealize Operations. An administrator has been asked to get a monthly cost estimate for running the workloads in a public cloud.
What are two of the public cloud providers that are supported out-of-the-box in vRealize Operations What-If planning for public cloud costs? (Choose two.)
To meet a requirement for protection against data loss in the event of a physical rack failure, an administrator is deploying a vRealize Operation cluster in a Continuous Availability configuration.
Which three node types will be configured within this scenario? (Choose three.)
An administrator has been notified of a critical alert associated with a VMware vCenter cloud account. The alert states that "Objects are not receiving data from adapter instance". The administrator investigated the problem and resolved the underlying issue. The administrator now needs to stop the alert from triggering again, unless the problem occurs in the future.
Which alert action should the administrator take to meet the criteria?