Winter Sale - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

Nokia 4A0-220 Exam With Confidence Using Practice Dumps

Exam Code:
4A0-220
Exam Name:
Nokia GMPLS-Controlled Optical Networks
Vendor:
Questions:
40
Last Updated:
Nov 18, 2025
Exam Status:
Stable
Nokia 4A0-220

4A0-220: Nokia Optical Network Services Expert Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the Nokia 4A0-220 (Nokia GMPLS-Controlled Optical Networks) exam? Download the most recent Nokia 4A0-220 braindumps with answers that are 100% real. After downloading the Nokia 4A0-220 exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the Nokia 4A0-220 exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the Nokia 4A0-220 exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (Nokia GMPLS-Controlled Optical Networks) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA 4A0-220 test is available at CertsTopics. Before purchasing it, you can also see the Nokia 4A0-220 practice exam demo.

Nokia GMPLS-Controlled Optical Networks Questions and Answers

Question 1

What is the purpose of the RSVP-TE Notify message?

Options:

A.

It is the node's alarm control channel

B.

It is a mechanism to inform the NM5 of L5P events

C.

It is a mechanism to inform non-adjacent nodes of LSP events

D.

It is confirmation of a node's resource reservation

Buy Now
Question 2

What is the GMRE notify address?

Options:

A.

The OSPF-TE broadcast IP used to flood the link adjacency information

B.

The LMP Control Channel ID. This field contains the IPv4 address of the ingress LER as a global unique identifier

C.

The email exchange server to notify the operators of network failures

D.

An IP address used to signal failures on downstream nodes upstream to the head node

Question 3

What is the Feasibility File in GMRE nodes?

Options:

A.

A file with commissioned GMRE nodes for NPA implementation

B.

A file of optical impairment parameters for power balance

C.

A file with target values that determine whether a given LSP can be routed

D.

A control checklist for the operator