Certinia PSA-Sysadmin Exam With Confidence Using Practice Dumps

Exam Code:
PSA-Sysadmin
Exam Name:
PSA System Administrator 2023
Certification:
Vendor:
Questions:
60
Last Updated:
Nov 5, 2025
Exam Status:
Stable
Certinia PSA-Sysadmin

PSA-Sysadmin: PSA Certified Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the Certinia PSA-Sysadmin (PSA System Administrator 2023) exam? Download the most recent Certinia PSA-Sysadmin braindumps with answers that are 100% real. After downloading the Certinia PSA-Sysadmin exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the Certinia PSA-Sysadmin exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the Certinia PSA-Sysadmin exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (PSA System Administrator 2023) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA PSA-Sysadmin test is available at CertsTopics. Before purchasing it, you can also see the Certinia PSA-Sysadmin practice exam demo.

Related Certinia Exams

PSA System Administrator 2023 Questions and Answers

Question 1

Your company wants to regularly update the current Time Period for all Region, Practices, Groups, Projects, and Resources (RPGPR). Which is the best option to meet this requirement?

Options:

A.

Schedule the RPGPR Maintenance Batch in PSA Administration

B.

Manually update the Time Period on all RPGPR records

C.

Enable the RPGPR Time Period auto update feature in Setup

Buy Now
Question 2

A user has reported that their Utilization Report doesn't have data for the last few weeks.

Which two of the following are possible causes of this issue? (Choose two.)

Options:

A.

There is an issue with "Time Periods" for the relevant date range (for example, duplicate Time Periods]

B.

The "Utilization Calculation" scheduled job has an error and stopped running properly

C.

The "Estimates vs Actuals" scheduled job has an error and stopped running properly

Question 3

A manager was looking at utilization for a resource for the last two months. The resource was identified as 80% utilized for each month, but the subtotal section showed 160% for the user for that same two month period.

How can the report be fixed to show 80% instead of 160%?

Options:

A.

Adjust the Resource's work calendar to 40 hours and refresh the report

B.

Create a Summary Level formula so the subtotal is calculated and not summed

C.

Set the "Utilization" setting for Target Utilization Approach to "Weighted"