Big Black Friday Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

WELL WELL-AP Exam With Confidence Using Practice Dumps

Exam Code:
WELL-AP
Exam Name:
WELL Accredited Professional (WELL AP) Exam
Vendor:
Questions:
204
Last Updated:
Nov 27, 2025
Exam Status:
Stable
WELL WELL-AP

WELL-AP: WELL Accredited Professional Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the WELL WELL-AP (WELL Accredited Professional (WELL AP) Exam) exam? Download the most recent WELL WELL-AP braindumps with answers that are 100% real. After downloading the WELL WELL-AP exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the WELL WELL-AP exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the WELL WELL-AP exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (WELL Accredited Professional (WELL AP) Exam) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA WELL-AP test is available at CertsTopics. Before purchasing it, you can also see the WELL WELL-AP practice exam demo.

Related WELL Exams

WELL Accredited Professional (WELL AP) Exam Questions and Answers

Question 1

Please click on the Project Scenario A button to review the project scenario and answer the following question.

MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A

MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their

primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.

They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.

Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx. 328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.

MILO considers itself a human-centric design firm and leads with a people-first approach through its

employee benefits and organizational policies. As an example, they offer a 50% discount on several

mindfulness apps and make guided meditation courses available twice per year to all employees on-site.

PROJECT SCOPE & GOALS

MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.

The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.

MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.

Furniture is acquired for 45 employees what is the minimum number of manual or electric height -adjustable work surfaces needed to meet Feature V02: Ergonomic Workstation Design. Part 2 Provide Height-Adjustable Work Surfaces?

Options:

A.

10 height-adjustable work surfaces

B.

11 height-adjustable work surfaces

C.

12 height-adjustable work surfaces

D.

13 height adjustable work surfaces

Buy Now
Question 2

During a project review meeting, a member of the facility management team states that asbestos containing materials (ACMs) may be present within the project boundary. What strategy should the project team follow to evaluate this issue?

Options:

A.

Notify any building occupants about the risk of ACMs

B.

Create an asbestos action plan to remediate the ACMs and schedule ongoing inspections

C.

Obtain a letter from the building owner affirming there are no known ACMs in the project boundary

D.

Hire a qualified inspector to investigate the project boundary and space to determine whether ACMs are present

Question 3

Which of the following strategies can be used to improve the visual balance in a workspace?

Options:

A.

Vary the color temperatures of light fixtures within the room

B.

Increase the horizontal and vertical luminance contrast ratios to 15

C.

Replace magnetic ballasts on fluorescent lights with electronic ones

D.

Increase the illuminance uniformity ratio to at least 0.4 on the work surface