A project registered under WELL Core Certification has a total area of 100.000 ft3 (9 290 m2). What is the minimum of the total building floor area that should be available tor performance testing?
A)

B)

C)

D)

A project team performed quarterly water testing and determined that the total dissolved solids (TDS) is above the 500 mg/L threshold. Which of the following steps should the project team take to address this issue?
indoor air tests for a project show high levels of carbon monoxide and nitrogen dioxide. This indicates the presence of which of the following"?