New Year Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

USGBC LEED-AP-O+M Exam With Confidence Using Practice Dumps

Exam Code:
LEED-AP-O+M
Exam Name:
LEED AP Operations + Maintenance (LEED AP O+M)
Vendor:
Questions:
166
Last Updated:
Dec 14, 2025
Exam Status:
Stable
USGBC LEED-AP-O+M

LEED-AP-O+M: Leadership in Energy and Environmental Design (LEED) Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the USGBC LEED-AP-O+M (LEED AP Operations + Maintenance (LEED AP O+M)) exam? Download the most recent USGBC LEED-AP-O+M braindumps with answers that are 100% real. After downloading the USGBC LEED-AP-O+M exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the USGBC LEED-AP-O+M exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the USGBC LEED-AP-O+M exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (LEED AP Operations + Maintenance (LEED AP O+M)) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA LEED-AP-O+M test is available at CertsTopics. Before purchasing it, you can also see the USGBC LEED-AP-O+M practice exam demo.

Related USGBC Exams

LEED AP Operations + Maintenance (LEED AP O+M) Questions and Answers

Question 1

The minimum amount of renovation or new construction work required to qualify for Materials and Resources Credit, Purchasing - Facility Maintenance and Renovations is

Options:

A.

correlated to an increase of the floor area by at least 5%

B.

determined based upon flush-out procedure requirements

C.

determined by the project team as there is no minimum requirement

D.

correlated to alterations that include construction activity by more than one trade

Buy Now
Question 2

At a minimum, which two factors must be continuously monitored by the system in order to achieveIndoor Environmental Quality Credit, Thermal Comfort?

Options:

A.

Air speed and humidity

B.

Humidity and air temperature

C.

Air speed and air temperature

D.

Radiant temperature and air speed

Question 3

The project team of an existing urban site has 4% total vegetated area and desires to increase the percentage to

equal or be greater than 5%. Which strategy can the team implement to achieve this goal?

Options:

A.

Install a vegetated roof system

B.

Convert lawn areas to native plants

C.

Mitigate the vegetated area off-site through a land trust

D.

Convert the paved areas of the site to pervious pavement