Winter Sale - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

USGBC LEED-AP-O+M Exam With Confidence Using Practice Dumps

Exam Code:
LEED-AP-O+M
Exam Name:
LEED AP Operations + Maintenance (LEED AP O+M)
Vendor:
Questions:
166
Last Updated:
Nov 17, 2025
Exam Status:
Stable
USGBC LEED-AP-O+M

LEED-AP-O+M: Leadership in Energy and Environmental Design (LEED) Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the USGBC LEED-AP-O+M (LEED AP Operations + Maintenance (LEED AP O+M)) exam? Download the most recent USGBC LEED-AP-O+M braindumps with answers that are 100% real. After downloading the USGBC LEED-AP-O+M exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the USGBC LEED-AP-O+M exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the USGBC LEED-AP-O+M exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (LEED AP Operations + Maintenance (LEED AP O+M)) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA LEED-AP-O+M test is available at CertsTopics. Before purchasing it, you can also see the USGBC LEED-AP-O+M practice exam demo.

Related USGBC Exams

LEED AP Operations + Maintenance (LEED AP O+M) Questions and Answers

Question 1

An organization pursuing LEED O+M certification for their headquarters has a renovation policy that includes strict requirements around the selection of building products and requires contractors working in the building to develop a plan for the diversion of waste produced during renovation projects. What must the organization add to their renovation policy to meet the requirements of Materials and Resources Prerequisite, Facility Maintenance and

Renovation Policy?

Options:

A.

Requirements around the selection of low-emitting materials for renovation projects

B.

Requirements for contractors to safeguard air quality during renovation

C.

Requirements for the salvage and reuse of furniture within the building

D.

Requirements for contractors to perform construction activity pollution prevention

Buy Now
Question 2

Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies requires a project building to employ permanent entryway systems. How long must the entryway system be in the primary direction of travel?

Options:

A.

6 ft. (1.8 m)

B.

8 ft. (2.4 m)

C.

10 ft. (3 m)

D.

12 ft. (3.5 m)

Question 3

A LEED project is considering converting 75% of its existing composite roof to a vegetated roof. The project's landscape architect also suggests an open-grid pavement system for 30% of the site paving, and colored concrete for 25% of the site paving. Which of the following factors must be considered when selecting the materials for these strategies?

Options:

A.

The Solar Reflectance Index (SRI) of the colored concrete, and the unbound percentage of the open-grid pavement system

B.

The SRI of the vegetated roof system, and the unbound percentage of the open-grid pavement system

C.

The SRI of the vegetated roof system, and the SRI of the colored concrete

D.

The SRI of the colored concrete, and the SRI of the open-grid pavement system