VMware vSphere 8.x Advanced Design Questions and Answers

Question 5

A company is expanding an existing vSphere deployment to meet new demands from the business. The following requirements have been identified for the expanded infrastructure:

REQ001- It must support enhanced vMotion compatibility (EVC) mode for Intel "Nehalem" Generation (Intel Xeon Core i7) processors.

REQ002- It must be accessible via an API.

REQ003- It must support a variety of operating systems.

REQ004- It must notify administrators whenever a virtual machine is connected to more than one network.

Which requirement would be classified as a technical (formerly non-functional) requirement?

Options:

A.

It must be accessible via an API.

B.

It must notify administrators whenever a virtual machine is connected to more than one network.

C.

It must support enhanced vMotion compatibility (EVC) mode for Intel "Nehalem" Generation (Intel Xeon Core i7) processors.

D.

It must support a variety of operating systems.

Question 6

An architect is designing the datastore configuration of a new vSphere-based solution.

The following information was obtained during the initial meeting with the customer:

There is currently 500 production and DMZ virtual machine workloads spread evenly across the primary and secondary site.

The profile of the workloads (per site) is as follows:

- DMZ:

-- 75 x Small: 1 vCPU, 2GB RAM, 200 GB disk

- Production:

-- 50 x Small: 1 vCPU, 2 GB RAM, 200 GB disk

-- 100 x Medium: 2 vCPU, 4 GB RAM, 200 GB disk

-- 25 x Large: 4 vCPU, 8 GB RAM, 500 GB disk

The average IO Profile per workload is 70/30 read/write.

The solution should cater to 10% storage growth in the first year.

The solution should cater to 15% virtual machine snapshot overhead.

The storage team has confirmed:

- A scalable external storage array has been deployed per site to support the storage requirements.

- The storage array will connect to all hosts using a dedicated Fibre Channel storage area network fabric.

- Usable storage capacity is available in 10 TB LUNs.

- As many LUNs as required can be provided.

- Every effort should be made to ensure the number of required LUNs is minimized.

The security team has stated that all DMZ and production workloads must remain logically isolated from each other.

Given the information provided, which three design decisions should the architect make to meet the requirements? (Choose three.)

Options:

A.

Six 10TB VMFS datastores will be configured on each site for all production workloads.

B.

Four 10TB VMFS datastores will be configured on each site for all production workloads.

C.

Each 10TB LUN will be configured as a VMFS datastore.

D.

Two 10TB VMFS datastores will be configured on each site for all DMZ workloads.

E.

Each 10TB LUN will be configured as an NFS datastore.

F.

Seven 10TB VMFS datastores will be configured on each site for all workloads.

Question 7

An architect is responsible for designing a new vSphere-based solution to meet the following customer requirements:

The solution must support component-level redundancy.

The solution must support physical segregation of management and workload traffic.

Any traffic from virtual infrastructure-level operations (such as migrations of workloads between hosts within a cluster) must not impact any workload.

The solution should react to any substantial impact of physical network traffic to ensure workload traffic is unaffected.

In response to this requirement, the architect makes the following logical design decisions:

The solution will separate vSphere management traffic from all other network traffic.

The solution will ensure that all replication and vMotion traffic will be separated from all other traffic.

The solution will separate workload traffic from all other network traffic.

The customer has a hardware standard for physical VMware ESXi host servers that includes 6 x 10 GbE network.

Which three physical design decisions should the architect make to meet the requirements? (Choose three.)

Options:

A.

The solution will configure the Route Based on Source MAC Hash load balancing method.

B.

The solution will deploy three (3) vSphere standard switches each with a single uplink port group.

C.

The solution will configure the six (6) available network connections into load balanced pairs.

D.

The solution will deploy a vSphere distributed switch with three (3) uplink port groups.

E.

The solution will configure the six (6) available network connections into a single load balanced group.

F.

The solution will configure the Route Based on Physical NIC Load load balancing method.

Question 8

An architect is designing a backup solution.

Which two statements should be included in the logical design for this solution? (Choose two.)

Options:

A.

The database must be backed up even/ day during the maintenance window of 1:00AM and 3:00AM.

B.

The network that will be used for backups will be configured to use VLAN ID 1511.

C.

The bkp-nfs-01 datastore will be used for backups.

D.

The company's existing backup solution will be unsupported by the third-party vendor in six months.

E.

The database will be backed up using an API-based backup solution.

Page: 2 / 7