Refer to the exhibit by clicking on the EXHIBIT button above.

If the glulam beam and CLT panels all require a fire-resistance rating of 2 hours, what is the required fire-resistance rating in hours for the structural connections between the glulam and CLT?
In mass timber construction of Type IV-C, the fire-resistance ratings of bearing walls are permitted to be reduced by _____ where supporting a roof only.
In Type IV-C construction, the fire-resistance rating provided by protection over a connection can be determined by which of the following?
Refer to the exhibit by clicking on the EXHIBIT button above.

In the detail shown, what is the required tolerance in inches between the steel beam web and CLT?