Question 21

To assess the feasibility of earning Location and Transportation Credit, Reduced Parking Footprint, the project team should be familiar with what local government regulation?

Options:

A.

Minimum number of parking spaces required by the local zoning code

B.

Maximum dimensions for on-street parking spaces allowed by the local zoning code

C.

Minimum number of electric vehicle charging spaces required by the local zoning code

D.

Maximum number of levels in structured parking garages allowed by the local zoning code

Question 22

In a goal-setting workshop, a project team identifies that teleworking could reduce building area and therefore the required plug loads. What is a requirement for the documentation of the energy-related systems of the Integrative Process worksheet?

Options:

A.

Providing a narrative of one plug load reduction

B.

Providing calculations of only the plug load reduction

C.

Providing explanations of at least two plug load reduction strategies

D.

Providing detailed comparative energy model before completing schematic design to evaluate energy load reduction strategies

Question 23

A proposed LEED project will be located within the boundary of a development that has been successfully certified at the Silver level under LEED for Neighborhood Development. The project will earn 10 points from the Location and Transportation Credit, LEED for Neighborhood Development Location. How many additional credit points are available to the project team under the Location and Transportation category?

Options:

A.

Zero additional points are available under the Location and Transportation category

B.

Two additional points are available only in Location and Transportation Reduced Parking Footprint

C.

Eight additional points are available under the Location and Transportation category

D.

18 additional points are available under the Location and Transportation category

Question 24

A project is pursuing Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control. Which lighting control could the design team specify to meet the credit requirements for open-office workstations?

Options:

A.

Standard on-off switches at each workstation

B.

Plug-in task light at each workstation that allow for on, off and a 50% light level

C.

Overhead lighting for the open-office space with fully automatic dimming via daylight sensors for the space

D.

Overhead lighting for the open-office space with controls that allow for on, off and a 50% light level for the space