Weekend Sale Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

Exactprep LEED-AP-ID+C Questions

LEED AP Interior Design + Construction (LEED AP ID+C) V4 Questions and Answers

Question 17

Based on the results of a six-hour waste stream study, the team for an Interior Design and Construction Retail project plans to provide dedicated areas for four recyclable waste streams: cardboard, plastic, metal, and paper.

The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team's top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite, Storage and Collection of Recyclables?

Options:

A.

Take appropriate measures for the safe collection, storage and disposal of batteries

B.

Make a waste stream projection for the entire year based on the six hours of the waste stream study

C.

Make a waste stream projection for the entire week, based on the six hours of the waste stream study

D.

Extend the waste stream study to cover a representative time period of a minimum of 24 hours to identify the top five recyclable waste streams

Question 18

A tenant space includes an open office floor plan of 100 workstations and 10 enclosed offices where each workspace is designed for individual use. Based on the requirements of Indoor Environmental Quality Credit, Interior Lighting,

what is the minimum number of occupants requiring individual controls to achieve one point?

Options:

A.

81 occupants

B.

90 occupants

C.

99 occupants

D.

100 occupants

Question 19

A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of the project's gross floor will be

completed by the time of occupancy. LEED certification is being sought. Which rating system would be the most

appropriate one to use?

Options:

A.

LEED Interior Design and Construction

B.

LEED Building Design and Construction

C.

LEED for Homes

D.

No rating system

Question 20

A tenant is targeting LEED Platinum certification and has hired a LEED AP Interior Design and Construction consultant to help identify and use opportunities to achieve synergies across disciplines and building systems.

Which of the following analyses are required to be completed in the Integrated Process Worksheet to achieve an additional point?

Options:

A.

Water-Related Systems

B.

Energy-Related Systems

C.

Indoor Air Quality Systems

D.

Waste Management Systems