Newly Released ISTQB CTAL-TTA Exam PDF

Page: 2 / 10
Total 129 questions

Certified Tester Advanced Level Technical Test Analyst Questions and Answers

Question 5

Given the following code:

If x > y and z = 3 statement!

elseif z = 4 statement

endif;

What is the minimum number of tests needed to achieve 100% decision coverage?

Options:

A.

1

B.

2

C.

3

D.

4

Question 6

Consider the following specification:

If you are flying with an economy ticket, there is a possibility that you may get upgraded to business class, especially if you hold a gold card in the airline’s frequent flier program. If you don’t hold a gold card, there is a possibility that you will get ‘bumped’ off the flight if it is full when you check in late.

This is shown in the control flow graph below. Note that each box (i.e., statement, decision) has been numbered.

Three tests have been run:

Test 1: Gold card holder who gets upgraded to business class

Test 2: Non-gold card holder who stays in economy

Test 3: A person who is bumped from the flight

What is the level of decision coverage achieved by these three tests?

Options:

A.

60%

B.

67%

C.

75%

D.

80%

Question 7

Your Agile team is developing a web-based system that will allow users to browse and buy online from a store's shopping catalogue. Continuous Integration has been implemented and technically it is working well, running several times per day, but each run is taking almost as much time as the team is prepared to allow. It is clear that after a few more iterations, as the number of tests needed grows with the product, it will be taking too much time.

Which of the four options contains a pair of solutions that will BOTH help to solve this problem?

a.Only include unit and component integration tests in the automated Cl runs.

b.Schedule low priority tests to be the first ones executed in each run, in order to provide rapid build verification.

c.Reduce the extent to which the automated tests go through the user interface, using technical interfaces instead.

d.Reduce the number of Cl cycles run each day.

e.Select a subset of automated tests for the daytime Cl runs, and run as many of the other tests as possible in an overnight cycle.

SELECT ONE OPTION

Options:

A.

d and e

B.

b and d

C.

c and e

D.

a and c

Question 8

The F in the mnemonic FIRST stands for Fast Which option correctly states the meanings of the other four letters (IRST)?

SELECT ONE OPTION

Options:

A.

isolated, Reliable. Self-Verifying, Timely.

B.

Independent, Reliable, Self-Validating, Timely

C.

independent. Repeatable, Self-Verifying, Thorough.

D.

Isolated. Repeatable. Self-Validating, Thorough.

Page: 2 / 10