Identify the activity that is NOT part of the performance test preparation.
SELECT ONE OPTION
Base Scenario 1: This Base Scenario 1 is used for 2 questions throughout this exam. When you refer to Base Scenario 1, you are referring to this description and only this description, without any modification.
k given project for the development of a management software that will have a multilayer architecture will enable Its users to Install it in multiple locations, nationally and internationally - each installation can operate Independently and communicate with other instances in a selective way. Each installation shall have a high processing capacity.
Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).
• The project follows a sequential development life cycle model.
Question
Which is the right moment in the project to analyze and evaluate the performance risks?
SELECT ONE OPTION
Associate each type of performance test (listed from 1 to 5) with part of a description that allows its characterization and/or identification (listed from A to E).
1.Endurance testing
2.Scalability testing
3.Capacity testing
4.Stress testing
5.Concurrency testing
1.Type of testing focused on the ability of a system to meet future efficiency requirements.
2.Type of testing used to evaluate a system's ability to handle reduced availability of resources.
3.Type of testing focused on the stability of the system over a specific time frame.
4.Type of testing used to determine the number of transactions a given system will support while still meeting established performance objectives.
5.Type of testing focused on the impact of situations where specific actions occur simultaneously.
SELECT ONE OPTION
Identify the correspondences between performance measures and metrics (1 -6) and the different environments (A C) in which performance evaluation is needed.
1.Alerts and warnings.
2.Concurrency of usage.
3.Operational processes.
4.Resource utilization.
5.Response time.
6.Throughput of data, transactions, and other units of work performed.
1.Operating environment.
2.Business environment.
3.Technical environment.