Question 53

What happens when an Dell Avamar advanced retention policy is used for backups?

Options:

A.

Retention rules are applied to backups based on the backup completion time

B.

Retentions are dynamically assigned to scheduled backups based on when the backups occur

C.

The daily retention value is automatically assigned to on-demand backups

D.

An upper retention limit is dynamically applied to all backups

Question 54

What is the maximum number of nodes that can be configured for an Dell Avamar multi-node grid?

Options:

A.

15 storage, 1 utility, 1 NDMP, and 1 spare

B.

16 storage, 1 utility, and 1 spare

C.

17 storage and 1 utility

D.

17 storage, 1 utility, and 1 spare

Question 55

On an Dell Avamar server, the maintenance schedule is enabled. If the server is over a certain capacity, when will the server automatically cancel backups that are running under the default configuration?

Options:

A.

At the start of the blackout window

B.

At the start of the maintenance window

C.

After the first checkpoint in the blackout window

D.

After the backup has fully completed

Question 56

Which Dell Avamar Management Console navigation screen can be used to check when the last checkpoint and checkpoint validation occurred?

Options:

A.

Server

B.

Activity

C.

Administration

D.

Policy

Page: 14 / 18