Labour Day Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

CTFL2018 CTFL_Syll2018 Exam Dumps

Page: 21 / 27
Total 365 questions

ISTQB Certified Tester Foundation Level (Syllabus 2018) Questions and Answers

Question 81

Testing should provide sufficient information to stakeholders to make informed decisions about the release of the software or system being tested. At which of the following fundamental test process activity the sufficiency of the testing and the resulting information are assessed?

Options:

A.

Implementation and execution

B.

Requirements specification

C.

Evaluating exit criteria and reporting.

D.

Analysis and design

Question 82

The following incident report that was generated during test of a web application

What would you suggest as the most important report improvement?

Defect detected date: 15.8.2010

Defect detected by. Joe Smith

Test level System test

Test case Area 5/TC 98

Build version: 2011-16.2

Defect description After having filled out all required fields in screen 1,1 click ENTER to continue to screen 2. Nothing happens, no system response at all.

Options:

A.

Add an impact analysis

B.

Add information about which developer should fix the bug

C.

Add the time stamp when the incident happened

D.

Add information about which web browser was used

Question 83

Which of the following statements is correct?

Options:

A.

Pair programming is done with developer and tester pairing together

B.

Pair programming is an alternative term for code inspection.

C.

Pair programming is used usually in waterfall model

D.

Pair programming is, among other things, an informal review method.

Question 84

Which of the following is NOT a deciding factor in determining the extent of testing required?

Options:

A.

Budget to do testing

B.

A particular tester involved in testing

C.

Level of risk of the product or features

D.

Time available to do testing

Page: 21 / 27
Total 365 questions