Halloween Sale Special - 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: big75certs

CCNP Data Center 300-610 Reddit Questions

Page: 13 / 22
Total 299 questions

Designing Cisco Data Center Infrastructure for Traditional and AI Workloads v1.2 (DCID 300-610) Questions and Answers

Question 49

Which authentication software natively runs within the CLI of Cisco NX-OS devices?

Options:

A.

Python

B.

Ansible

C.

Puppet

D.

Chef

Question 50

A network consultant must design a high availability interconnection of a clustered Cisco UCS Fabric Interconnect toward two upstream Layer 2 switches. The Ethernet interconnection must use all redundant links and have no impact on the STP domain size.

Which connectivity solution must be used?

Options:

A.

Cisco UCS Fabric Interconnect in switch mode with dual uplinks distributed evenly to the upstream switches

B.

Cisco UCS Fabric Interconnect in switch mode with a single uplink toward each upstream switch to eliminate any change to the STP domain size

C.

Cisco UCS Fabric Interconnect in end host mode with a single uplink toward each upstream switch to eliminate any change to the STP domain size

D.

Cisco UCS Fabric Interconnect in end host mode with dual uplinks distributed evenly to the upstream switches

Question 51

A customer deploys 32 virtualization hosts in a Cisco UCS domain. All hosts run in the same cluster and have Identical hardware specifications. The operating system requires that all firmware is consistent across the hosts (or driver support. The customer must provision additional interfaces later for expandability. Which feature of Cisco UCS Manager meets these requirements?

Options:

A.

Initial Service Profile Template

B.

Initial vNIC Template

C.

Updating Service Profile Template

D.

Updating vNIC Template

Question 52

A network administrator must simplify and optimize the VRF architecture in a Cisco ACI fabric. The current deployment contains multiple tenants, each with its own network stack, and uses VRF leaking for inter-tenant communication. The large number of tenants and leaked routes is causing the switches to approach their prefix-capacity limits. Which solution should the engineer recommend?

Options:

A.

Collapse all VRFs into a single VRF in the management tenant.

B.

Collapse all VRFs into multiple VRFs in the management tenant and continue using VRF leaking.

C.

Collapse all VRFs into multiple VRFs in the common tenant and continue using VRF leaking.

D.

Collapse all VRFs into a single VRF in the common tenant.

Page: 13 / 22
Total 299 questions