Question 9

What is the FIRST stage in troubleshooting an AV system?

Options:

A.

evaluating possible sources of error

B.

identifying the symptoms of the error

C.

determining which devices are fully functional

D.

reviewing the system diagram showing the connections and the signal flow

Question 10

The installation of a complex AV project is planned to be completed within 6 months. What is the MOST cost-effective plan for ordering the equipment for the project?

Options:

A.

Order everything as soon as the contract is signed.

B.

Place the order 5 days before the scheduled day for starting installation.

C.

Order each piece of equipment to be delivered as soon as possible.

D.

Order equipment to be delivered on a "just in time" basis according to the installation schedule.

Question 11

Which of the following is the correct group of signal cables that can be cabled within one side of a rack while considering the signal separation in order to avoid electromagnetic interference?

Options:

A.

RF, loudspeaker, line level audio

B.

Loudspeaker, microphone, video

C.

Microphone, line level audio, relay control

D.

Microphone, line level audio, digital control

Question 12

A client has a laser projector that fails and appears dead after six months’ use. The documentation shows that the projector is covered by a return-to-base or back-to-bench warranty. The client can expect to:

Options:

A.

Receive remote-access repair service

B.

Receive on-site visit from service engineer

C.

Remove projector and ship back to manufacturer

D.

Remove projector and replace with advanced-shipped unit