Pre-Winter Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

NS0-077 Exam Dumps : NetApp StorageGRID Administrator Exam

PDF
NS0-077 pdf
 Real Exam Questions and Answer
 Last Update: Oct 16, 2026
 Question and Answers: 60
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
NS0-077 exam
PDF + Testing Engine
NS0-077 PDF + engine
 Both PDF & Practice Software
 Last Update: Oct 16, 2026
 Question and Answers: 60
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
NS0-077 Engine
 Desktop Based Application
 Last Update: Oct 16, 2026
 Question and Answers: 60
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

NetApp StorageGRID Administrator Exam Questions and Answers

Question 1

Your customer is working in a secure environment and will not allow the StorageGRID nodes to connect directly to the internet. The customer wants to take advantage of NetApp AutoSupport capabilities and automatic case creation.

How does the customer have to configure AutoSupport?

Options:

A.

Manually upload AutoSupport bundles each week.

B.

Configure AutoSupport to send a minimized configuration.

C.

Configure AutoSupport to enable on-demand only.

D.

Configure AutoSupport to use a proxy server.

Buy Now
Question 2

A StorageGRID system is composed of Linux-based nodes running on hosts in your data center. You want to decommission Host-A containing Storage Node Linux-Node-1, and you must migrate Linux-Node-1 to a new host, Host-B.

What is the correct sequence of steps to migrate Linux-Node-1 from Host-A to Host-B?

Options:

A.

Use the Grid Manager to select Linux-Node-1 and initiate the migration. The Grid Manager automatically moves the node’s container and data. The administrator only needs to reboot Host-A after the migration is complete.

B.

On Host-B, run the storagegrid node import command. On Host-A, use the storagegrid node export command to export the node. On Host-A, stop the StorageGRID service. Use the Grid Manager to finalize the node migration.

C.

On Host-A, stop the node using the storagegrid node stop Linux-Node-1 command. On Host-A, export the node using the storagegrid node export Linux-Node-1 command. On Host-B, import the node using the storagegrid node import command, referencing the exported data. Use the Grid Manager to verify the migration status.

D.

Unmount the shared storage volumes from Host-A. On Host-B, mount the shared storage volumes. On Host-B, install StorageGRID and reconfigure Linux-Node-1. Restart the StorageGRID service on Host-B.

Question 3

A customer has a small office location that needs fast local read access to their bucket dataset. The office location has limited rack space and power available, with only a single network closet for installation.

How can you expand the grid to meet the customer's requirements?

Options:

A.

Add a new site of two SG110 Gateway Nodes and three SG5812 Storage Nodes for the new location.

B.

Add an SG5812 appliance as a caching Gateway Node to an existing site for the new location.

C.

Add a new site of two SG1100 Gateway Nodes and three SGF6112 Storage Nodes for the new location.

D.

Add an SGF6112 appliance as a caching Gateway Node to an existing site for the new location.