EMC Related Exams
E20-598 Exam

A Microsoft Windows user is about to initiate an on-demand backup from the client interface when the utility node fails on their multi-node EMC Avamar grid. What must be done prior to initiating the backup to ensure the backup will complete successfully?
You are installing a single-node Gen4 Avamar Data Store. Which label is on the port that is optionally used to connect the node to the second customer switch for high availability?
Which command is used to convert new Avamar nodes to storage nodes?