EMC Related Exams
DEE-1111 Exam
SRDF/A MSC has been configured between two sites. There are two PowerMax arrays at the source site and two PowerMax arrays at the target site. An SRDF/A MSC trip event has occurred.
What happens if the Receive Delta Set on one of the target arrays is incomplete?
Refer to the exhibit.

What should be done first to recover from this Concurrent SRDF/Star configuration failure?

Refer to the exhibit.
Which correctly describes a possible configuration created by SYMACL?