Spring Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

201-01 Exam Dumps : Riverbed Certified Solutions Associate - Network Performance Management

PDF
201-01 pdf
 Real Exam Questions and Answer
 Last Update: Feb 26, 2026
 Question and Answers: 245
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
201-01 exam
PDF + Testing Engine
201-01 PDF + engine
 Both PDF & Practice Software
 Last Update: Feb 26, 2026
 Question and Answers: 245
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
201-01 Engine
 Desktop Based Application
 Last Update: Feb 26, 2026
 Question and Answers: 245
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

Riverbed Certified Solutions Associate - Network Performance Management Questions and Answers

Question 1

The trending/indexing setting on the Cascade Shark appliance apply to:

Options:

A.

A specific capture job

B.

All the capture jobs

C.

All the capture ports on the appliance

D.

A specific capture port on the appliance

Buy Now
Question 2

What are the Cascade Profiler Alert Levels?

Options:

A.

Low and High

B.

Emergency, Critical, Alert, Error, Warning, Notice, Informational, and Debug

C.

Critical, Warning, and Informational

D.

System Down, System Impaired, Attack, SLA/SLO Violation, and Security Policy Violation

E.

Low, Med, and High

Question 3

Within Cascade Pilot, a sequence diagram is used to:

Options:

A.

Show timing and other information at the network or data link layer

B.

Show timing and other information at the application or transport layer

C.

Adjust the length of a trace clip created from a capture job trace

D.

Adjust the length of a trace clip created from a packet capture (pcap) file

E.

C and D