Labour Day Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

Nokia 4A0-265 Dumps

Page: 1 / 3
Total 40 questions

Nokia Optical Diagnostics and Troubleshooting Questions and Answers

Question 1

Consider the exhibit. What do the different colored green columns indicate?

Options:

A.

Optical power levels measured multiple times against a specific interface, at 24-hour intervals for the same wavelength.

B.

Optical power levels measured for multiple wavelengths against a specific interface.

C.

Optical power levels measured at different interfaces throughout the optical path of a single wavelength.

D.

The average optical power levels measured for multiple wavelengths throughout their shared optical path.

Question 2

Consider the exhibit which shows an EPT Power Management Report referring to an ingress amplifier. What is the available output optical power range?

Options:

A.

-0.6 to 1.72 dB

B.

-0.02 to 1.14 dB

C.

0.56 to 1.14 dB

D.

0.56 to 1.72 dB

Question 3

Consider the exhibit. A single directional fiber cut is occurring between two amplifiers in unidirectional configuration with Raman pump.

Multiple services are crossing the affected span.

Which node(s) will report an Incoming Payload LOS" alarm?

Options:

A.

No node, as a Raman pump is used in Node A.

B.

Node C only.

C.

Both Node A and Node C

D.

Neither Node A nor Node C.

Question 4

Which of the following is a passive component in a CDC-F network configuration?

Options:

A.

130SCX10 Optical Transponder

B.

MSH4-FSB Fiber Shuffle Module

C.

WR20-TFM Wavelength Router

D.

IRDM20 Integrated ROADM

Question 5

Which of the following statements best describes the output of the command: show xc 1?

Options:

A.

OCH trail name, ITU channel, administrative/operational states, protection states, and Wave Keys for both directions.

B.

A list of cross-connections, including A-end, Z-end, frequency, ID number, OCH trail name, and administrative/operational states.

C.

A list of boards that this cross-connection passes through on the local node, along with administrative/operational states, expected power levels, and measured power levels.

D.

A list of all boards on all nodes that this cross-connection passes through, along with expected power levels, measured power levels, and allowed power deviations.

Question 6

Which of the following statements about the "config powermgmt egress 1/2 adjust status command" is TRUE?

Options:

A.

The command displays the status of power adjustment on the specified egress amplifier.

B.

The command enables power adjustment feature on the specified egress amplifier, as this feature Is always and only available at the egress amplification stage.

C.

The command enables power adjustment feature on the specified egress amplifier.

D.

The command displays commissioning status and WT decoder usage for the specified egress amplifiers only, as this feature is always and only done in the egress direction.

Question 7

Consider the exhibit which shows an EPT Power ManagementReport for an ingress amplifier.

What is the available output optical power range?

Options:

A.

-0.6 to 1.72 dB

B.

-0.02 to 1.14 dB

C.

0.56 to 1.14 dB

D.

0.56 to 1.72 dB

Question 8

On a bidirectional optical amplifier configuration, which of the following are Wavelength Tracker detection points?

Options:

A.

LINEOUT and SIGOUT interfaces.

B.

SIG interface only.

C.

LINE and SIG interfaces.

D.

An optical amplifier has no Wavelength Tracker detection points.

Question 9

Which of the following statements about 1-Day PMs is TRUE?

Options:

A.

1-Day PMs show measurements collected over the preceding 24 hours. Up to 8 bins are available for data storing.

B.

1-Day PMs show measurements collected since the beginning of the current day. Up to 8 bins are available for data storing.

C.

1-Day PMs show measurements collected over the preceding 24 hours. Up to 33 bins are available for data storing.

D.

1-Day PMs show measurements collected since the beginning of the current day. Up to 33 bins are available for data storing.

Question 10

Refer to the exhibit, which shows a conditions list from the 1830 PSS GUI. (i) What is the total number of alarms reported? (ii) How many service affecting alarms are displayed? (iii) How many conditions are displayed?

Options:

A.

(I) total number of alarms = 5

(ii) number of serviceaffectingalarms = 2

(Hi) number of conditions = 14

B.

(i) total number of alarms = 7

(ii) number of service affecting alarms = 5

(Hi) number of conditions = 7

C.

(i) total number of alarms = 2

(ii) number of service affecting alarms = 2

(Hi) number of conditions = 18

D.

(i) total number of alarms = 4

(ii) number of service affecting alarms = 14

(iii) number of conditions = 2

Question 11

Which of the following statements best describes the output of the CLI command: show wavekey wtmonitor 1/6/LINE summary?

Options:

A.

A list of all channels detected against the selected interface (in and out); it shows if a Wave Keys pair is expected, if a Wave Keys pair is received, and if the received Wave Keys pair is unexpected.

B.

A list of all channels on this interface for which any Wave Keys pair is being received.

C.

A list of all channels detected against the selected interface, including Wave Keys pair, channel status, expected and measured power, allowed deviation, and tolerance.

D.

A list of the unexpected channels detected against the selected interface.

Question 12

A "Power Adjustment Required" alarm was raised on the ingress amplifier in slot 1/10. Which of the following commands should be entered to manually adjust the related amplifier optical power levels?

Options:

A.

config powermgmt ingress 1/10 scot

B.

config powermgmt ingress 1/10 power adjustment

C.

config powermgmt ingress 1/10

D.

config powermgmt ingress 1/10 adjust

Page: 1 / 3
Total 40 questions