Winter Sale - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

NICET ITFAS-Level-1 Exam With Confidence Using Practice Dumps

Exam Code:
ITFAS-Level-1
Exam Name:
Inspection and Testing of Fire Alarm Systems Level I Exam
Vendor:
Questions:
85
Last Updated:
Nov 4, 2025
Exam Status:
Stable
NICET ITFAS-Level-1

ITFAS-Level-1: Inspection and Testing of Fire Alarm Systems Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the NICET ITFAS-Level-1 (Inspection and Testing of Fire Alarm Systems Level I Exam) exam? Download the most recent NICET ITFAS-Level-1 braindumps with answers that are 100% real. After downloading the NICET ITFAS-Level-1 exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the NICET ITFAS-Level-1 exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the NICET ITFAS-Level-1 exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (Inspection and Testing of Fire Alarm Systems Level I Exam) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA ITFAS-Level-1 test is available at CertsTopics. Before purchasing it, you can also see the NICET ITFAS-Level-1 practice exam demo.

Related NICET Exams

Inspection and Testing of Fire Alarm Systems Level I Exam Questions and Answers

Question 1

Which three of the following are how a McCulloh transmitter should be inspected? (Choose three.)

Options:

A.

Distinct waterflow condition

B.

Physical condition

C.

System normal condition

D.

Verify location

Buy Now
Question 2

An inspector is testing the ground-fault monitoring circuit on the control panel. How does the inspector perform this test?

Options:

A.

Remove the primary power to the main control panel.

B.

Remove the signaling line circuit from the main control panel.

C.

Verify presence of a ground fault with a meter using the ohm scale.

D.

Verify the ground-fault indication when circuits are grounded.

Question 3

Which is true of the phone lines on a Digital Alarm Communicator Transmitter (DACT) when no other methods are in use?

Options:

A.

Phone lines must be dedicated.

B.

Primary line should be connected to the PSTN.

C.

Test signal must be sent every 24 hours.

D.

Two separate phone lines are required.